Accessibility: Skip TopNav
Figure 2
Figure 2: Illustrates the 170 meter strike length of oxide gold and silver mineralization defined by the Auryn’s trenching program. The mineralization remains open along the 1.5 km structural corridor.
Format
JPEG
Source
Auryn Resources Inc.
Téléchargements
Original
Grand
Moyen
Petit