Figure 1

Figure 1

Figure 1: Phase 2X drill plan map at the RPM Zone showing the 800-meter drill-confirmed strike length and the open 10-kilometer strike to Super Gulp within the 30-kilometer Pipestone XL nickel trend.

Format

JPEG

Source

First Atlantic Nickel Corp.

Téléchargements