Accessibility: Skip TopNav
Figure 1
Plan map of the Birch project showing 2025 and 2026 drill collars, the approximately 1-kilometre drilled strike extent of near-surface mineralized skarn, and the location of BR26-007 approximately 200 m east of BR25-003
Format
JPEG
Source
Yukon Metals Corp.
Téléchargements
Original
Grand
Moyen
Petit