Figure 1

Figure 1

Plan map of the Birch project showing 2025 and 2026 drill collars, the approximately 1-kilometre drilled strike extent of near-surface mineralized skarn, and the location of BR26-007 approximately 200 m east of BR25-003

Format

JPEG

Source

Yukon Metals Corp.

Téléchargements