Figure 3

Figure 3

Plan view showing the reported drill holes, BKR010 and BKR019 within the BK2 Target. The interpreted mineralized zone is highlighted in yellow. Reported drill intervals has a lower cut-off grade of 0.3 g/t Au and contain no more than 3m of internal waste.

Format

PNG

Source

Ongwe Minerals Inc.

Téléchargements