Figure 5

Figure 5

The Pipestone XL Nickel-Cobalt (Ni-Fe-Co) Alloy Project. Top: 3D view of the 30-kilometer Pipestone XL trend with the Company's magnetic survey draped on terrain, showing the RPM, Alloy Max, Super Gulp, Atlantic Lake and Chrome Pond Zones. Bottom, left to right: bedrock sample (two views) with visible disseminated awaruite, from beneath shallow overburden at an Alloy Max drill pad (April 8, 2026 news release); drill core with visible awaruite, hole XL-26-18 at 32 meters, Alloy Max South (October 13, 2026); photomicrograph of an awaruite grain up to approximately 2,000 microns, hole AN-25-08 at 370 meters, RPM Zone (September 25, 2025). Awaruite grades of 77.62% nickel and 1.69% cobalt are the RPM Zone electron microprobe average (May 21, 2026); the 67.4% nickel concentrate grade is the average of four flotation tests (June 24, 2026).

Format

JPEG

Source

First Atlantic Nickel & Cobalt Corp.

Téléchargements