Figure 2

Figure 2

Plan Map of all drill hole locations from this release, surface projection of 2026 Mineral Resource Estimate (MRE) with MRE pit outline at surface. Areas shown as interpreted mineralization represent the Company's geological interpretation of mineralization intersected in drilling. They are not included in the 2026 Mineral Resource Estimate, as drill spacing in these areas is currently insufficient. They are not Mineral Resources and there is no certainty that further drilling will result in their inclusion in a Mineral Resource.

Format

JPEG

Source

Cadillac Mines Corporation

Téléchargements