Accessibility: Skip TopNav
Figure 3
North–south vertical section through the Adina-Galinée pegmatite complex showing LIFT’s 2026 drill results and historical drill results previously reported to the ASX5, 6. Section trace A-A’ is shown in Figure 2.
Format
JPEG
Source
Li-FT Power Ltd.
Téléchargements
Original
Grand
Moyen
Petit