Starfield Resources Inc. Announces Definition Drilling Assay Results for Main Sulphide Lens(es) -- West Zone 'Pit Area'


VANCOUVER, British Columbia, Nov. 19, 2004 (PRIMEZONE) -- Starfield Resources Inc. (OTCBB:SRFDF) (TSX Venture Exchange:SRU) has received assay results for main sulphide lens(es) encountered in twelve additional definition drill holes completed within the eastern portion of the West Zone at the Ferguson Lake copper-nickel-cobalt-palladium-platinum property. This definition drilling, within an area of inferred resources, is part of Starfield's 2004 Phase I Exploration Program, which has the objective of increasing the "indicated" category of mineral resources reported in the 2002 estimate of 6.7 million tones at 1% Cu+Ni cut-off grade for the "Pit Area" (Dr. N.C. Carter, April 4, 2003). Previous 2004 assay results for the main lens(es) sulphide mineralization were reported for drill holes 04-162 to 04-180 (Press Release July 19, 2004, SRU-10-04; August 16, 2004, SRU-15-04).

Table I assay results are from inclined diamond drill holes completed over a strike length of 1.865 kilometers. Intersection lengths reported for the moderately north-dipping sulphide lenses approximate true thicknesses in this part of the West Zone.

Approximately 13,569 meters of 2004 NQ core drilling has been completed as part of Phase I drilling of the "Pit Area". It is important to note that these 2004 drill holes have a two-fold purpose. The first mineralization encountered in these holes consists of sulphide mineralization reflected by the continuous, strong, UTEM-3 conductor identified by initial surface geophysical surveys. This conductive zone is coincident with a similar strong conductor identified by an airborne VTEM survey in 2004. Gabbro-hosted footwall mineralization below the main sulphide lens(es) is also present in most holes drilled; assay results for this footwall-style of mineralization are pending for the holes reported below.

The Company continues to be encouraged by the main sulphide lens(es) results. In particular, holes 04-185, 04-187, 04-192 and 04-193 display considerable thicknesses of sulphide mineralization grading more than 2% copper + nickel.


                                   TABLE I
                  "PIT AREA" HIGHLIGHTS -- DEFINITION DRILLING -- 
                     MAIN SULPHIDE LENS(ES) ASSAY RESULTS
 ---------------------------------------------------------------------
                                                      
  Hole   Inclination     Location       Interval(m)        Length
  No.                                                    (m)      (ft)
 ------- ------------ -------------   --------------- ----------------
 04-182     -60
          (degree)    47+90W/ 1+75N    199.53-202.25     2.72    8.92
                         (including    199.53-201.15     1.62    5.31
 04-183     -75
          (degree)    47+90W/ 1+75N    159.68-164.30     4.62   15.16
                         (including    161.78-164.30     2.52    8.27

 04-184     -60       
          (degree)    47+45W/ 1+75N    152.96-155.58     2.62    8.60

 04-185     -75       
          (degree)    47+45W/ 1+75N    156.80-176.90    20.10   65.94
                         (including    156.80-162.02     5.22   17.13
                         (including    164.00-176.90    12.90   42.32

 04-186     -60
          (degree)    47+00W/ 1+75N    138.65-141.70     3.05   10.01
                                       141.70-149.55     Gabbro dyke
                                       149.55-153.35     3.80   12.47

 04-187     -75
          (degree)    47+00W/ 1+75N    171.43-179.00     7.57   24.84

 04-189     -60
          (degree)    57+00W/ 2+00N      61.17-65.00     3.83   12.57
                         (including      61.17-63.88     2.71    8.89

 04-190     -60
          (degree)    58+00W/ 2+00N      36.00-41.07     5.07   16.63
                                         44.75-46.19     1.44    4.72

 04-191     -60
          (degree)    58+00W/2+00N     105.74-107.08     1.34    4.40
                                       143.30-147.12     3.82   12.53

 04-192     -60
          (degree)    39+35W/1+40N       50.38-56.15     5.77   18.93
                                         56.15-65.70     Gabbro Dyke
                                         65.70-72.45     6.75   22.15
                                         85.06-88.02     2.96    9.71
 04-193    -72.5
          (degree)    39+35W/1+40N       55.55-62.12     6.57   21.56
                                         68.45-79.00    10.55   34.61
 04-194     -60
          (degree)    48+80W/1+75N     150.70-164.80    14.10   46.26
                        (including     160.59-164.80     4.21   13.81
 --------------------------------------------------------------------
 Hole         Cu         Ni         Co        Pd        Pt     2 PGE*
 No.           %          %          %        g/t       g/t          
 ------    -------    -------    -------   -------   -------  -------
 04-182     0.524      0.225      0.030      1.08      0.25     1.33 
            0.712      0.361      0.048      1.48      0.40     1.88)
                                                                     
 04-183     1.151      0.588      0.077      1.01      0.11     1.12 
            1.658      1.021      0.131      2.07      0.18     2.25)
                                                                     
 04-184     1.276      0.563      0.074      1.16      0.10     1.26 
                                                                     
 04-185     1.078      0.899      0.121      2.00      0.25     2.25 
            1.339      0.802      0.106      1.70      0.43     2.13)
            1.123      1.069      0.145      2.20      0.21     2.41)
                                                                     
 04-186     1.047      0.737      0.092      1.60      0.50     2.10 
             0.93      1.088      0.139      1.77      0.16     1.93 
                                                                     
 04-187     1.402      1.075      0.138      1.93      0.20     2.13 
                                                                     
 04-189     0.599      0.307      0.047      0.57      0.15     0.72 
            0.653      0.347      0.067      0.66      0.09     0.75)
                                                                     
 04-190     0.726       1.07      0.129      1.87      0.17     2.04 
            0.913      0.533      0.085      1.21      0.19     1.40 
                                                                     
 04-191     0.394      0.534      0.067      1.13      0.12     1.25 
            0.942      0.676      0.088      2.02      0.11     2.13 
                                                                     
 04-192      1.37      0.922      0.113      2.02      0.27     2.29 
            1.377       0.98       0.12      2.30      0.64     2.94 
            1.188      1.021      0.213      2.12      0.17     2.29 
                                                                     
 04-193     1.436      1.024      0.102      2.30      0.27     2.57 
            0.752      0.956      0.106      1.90      0.26     2.16 
                                                                     
 04-194     0.944      0.398      0.046      1.00      0.19     1.19 
            1.655      0.512      0.059      1.27      0.16     1.43 

Details concerning drill core sampling, sample preparation, accredited laboratory geochemical and assay analytical methods, QC and QA procedures can be referred to in detail in Press Release # SRU-07-04, June 10, 2004, page 3.


 On behalf of the Board of Directors,
 "Glen C. Macdonald"
 Glen C. Macdonald, P.Geo., Director

(Glen Macdonald is the Qualified Person under National Instrument 43-101 responsible for preparing the technical disclosure in this news release)

This communication to shareholders and the public contains certain forward-looking statements. Actual results may differ materially from those indicated by such statements. All statements, other than statements of historical fact, included herein, including, without limitations statements regarding future production, are forward looking statements that involve various risks and uncertainties. There can be no assurance that such statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements. The TSX Venture Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of this release.



            

Tags


Contact Data