Pretium Resources Inc.: Brucejack's Valley of the Kings Drilling Intersects 17,750 Grams Per Tonne Gold


VANCOUVER, BRITISH COLUMBIA--(Marketwire - Oct. 27, 2011) - Pretium Resources Inc. (TSX:PVG) ("Pretivm") is pleased to report further assay results from its Brucejack Project in northern British Columbia which continue to demonstrate the continuity of high-grade gold mineralization in the Valley of the Kings Zone. Twelve intersections grade over 100 grams per tonne gold, including an intercept from hole SU-260 grading 17,750 grams per tonne gold over 0.5 meters, the second-highest grading gold intersection to date on the property (see Table 1 for the most recent 28 holes).

Selected highlights include:

  • Hole SU-260 intersected 0.5 meters with uncut grades of 17,750 grams of gold and 7,780 grams of silver per tonne (1.6 feet averaging 517.7 ounces gold and 226.9 ounces of silver per ton);
  • Hole SU-249 intersected 0.5 meters with uncut grades of 3,880 grams of gold and 1,745 grams of silver per tonne (1.6 feet averaging 113.2 ounces gold and 50.9 ounces silver per ton);
  • Hole SU-239 intersected 1.0 meter with uncut grades of 3,460 grams of gold and 1,515 grams of silver per tonne (3.3 feet averaging 100.9 ounces gold and 44.2 ounces silver per ton).

The bonanza-grade interval in hole SU-260 noted above was intersected at a depth of 68.4 meters down-hole, demonstrating the proximity of high-grade, visible gold to surface. Hole SU-260 was drilled 25 meters east of hole SU-115, which also intercepted near-surface high-grade gold with an interval of 0.5 meters with uncut grades of 18,755 grams of gold and 9,312 grams of silver per tonne at a down-hole depth of approximately 60 meters (see news release dated June 8, 2011).

The high-grade interval from hole SU-249 noted above is located approximately 100 meters above the high-grade interval from hole SU-12, drilled in 2009, with uncut grades of 16,948 grams of gold and 8,696 grams of silver per tonne over 1.5 meters.

The high-grade interval from hole SU-239 noted above is located on section with high-grade intervals from holes SU-135 and SU-150. Hole SU-135 intersected 0.5 meters with an uncut grade of 1,070 grams of gold, and SU-150 intersected two 0.5 meter intervals with uncut grades of 6,670 grams of gold and 1,640 grams of gold per tonne (see news releases dated July 27, 2011 and August 11, 2011).

Also of note from the results is hole SU-237, which intersected 3.0 meters grading 377 grams per tonne gold and 248 grams per tonne silver, located on the same section as SU-195 and SU-230.

Assay results for 26 holes from the 2011 drill program are outstanding, of which 18 are for the Valley of the Kings Zone. Pretivm will continue to report results as they are received, and will update the mineral resource estimate for Brucejack this quarter.

Table 1: Selected Brucejack Project Drill Results, October 2011 (SU-231 to SU-260)(1,4,5)

Hole
No.
Collar
Coords.
Dip/
Azimuth
From
(meters)
To
(meters)
Interval
(meters)
Gold
(g/t)
Silver
(g/t)
Capping(2)
VALLEY OF THE KINGS ZONE
SU-231 6257943N
426282E
-58/360 320.88 351.5 30.62 1.74 4.0
incl. 336.0 337.5 1.5 21.4 8.1
SU-232 6258090N
426311E
-50/180 158.0 177.5 19.5 1.13 4.7
230.0 237.5 7.5 5.24 6.1
incl. 230.0 231.5 1.5 15.9 18.5
312.76 336.0 23.24 6.09 5.6
incl. 328.5 336.0 7.5 16.2 9.7
385.5 387 1.5 48.9 31.2
SU-234 6258125N
426501E
-57/180 192.0 207.0 15.0 7.87 9.3
192.0 193.5 1.5 66.7 39.4
243.5 269.0 25.5 1.03 3.9
313.5 377.0 63.5 1.17 4.1
SU-235 6258028N
426430E
-50/180 29.3 53.5 24.2 1.96 9.1
incl. 94.5 108.85 14.35 3.52 13.5
incl. 162.46 164.0 1.54 12.3 783.0
SU-236 6258252N
426552E
-50/180 207.2 235.5 28.3 0.85 5.1
412.5 434.0 21.5 8.61 31.6 2 Au samples cut
incl. 415.18 417.22 2.04 195.8 146.0 uncut
incl. 416.55 417.22 0.67 493.0 338.0 uncut
SU-237 6257880N
426642E
-59/360 144.52 147.52 3.0 87.15 248.4 2 Au samples cut
or 144.52 147.52 3.0 377.2 248.4 uncut
incl. 144.52 145.52 1.0 679.0 498.0 uncut
280.0 290.0 10.0 2.60 47.6
incl. 288.0 288.5 0.5 26.9 72.4
SU-238 6258252N
426452E
-50/180 172.0 181.0 9.0 8.97 62.9
incl. 172.0 173.5 1.5 43.5 119.0
279.42 279.92 0.5 50.7 39.0
446.0 452.0 6.0 7.69 25.0
SU-239 6258090N
426311E
-60/180 61.5 63.0 1.5 165.0 78.3 uncut
289.54 290.54 1.0 190.5 49.5 uncut
310.84 325.5 14.66 22.72 112.6 1 Au sample cut
incl. 310.84 311.84 1.0 3,460.0 1515.0 uncut
incl. 324.0 325.5 1.5 129.5 75.3 uncut
SU-241 6258125N
426501E
-65/180 225.82 235.5 9.68 18.53 11.1 1 Au sample cut
incl. 225.82 226.82 1.0 133.5 53.8 uncut
SU-242 6257880N
426642E
-45/360 123.5 133.0 9.5 1.44 4.1
SU-243 6258048N
426430E
-50/180 35.5 78.79 43.29 3.53 16.9
incl. 37.0 38.5 1.5 78.0 66.2
175.0 179.5 4.5 0.96 135.1
SU-244 6258090N
426311E
-65/180 163.5 165.0 1.5 20.70 8.8
200.0 203.75 3.75 6.46 8.3
248.0 254.0 6.0 33.56 35.5 1 Au sample cut
incl. 251.0 252.5 1.5 162.5 126.0 uncut
322.5 324.0 1.5 37.5 18.5
SU-246 6257796N
426552E
-53/360 274.61 313.5 38.89 0.80 3.8
355.5 384.0 28.5 1.99 6.5
incl. 357.0 358.5 1.5 22.5 27.8
SU-247 6257880N
426691E
-50/360 138.5 141.5 3.0 10.49 12.8
280.61 281.33 0.72 32.8 51.1
SU-248 6258068N
426430E
-50/180 110.0 118.32 8.32 1.57 40.7
230.01 249.5 19.49 1.69 9.2
incl. 230.01 230.51 0.5 28.0 51.0
SU-249 6258051N
426507E
-57/180 115.59 117.5 1.91 37.29 460.0 1 Au sample cut
incl. 115.59 116.09 0.5 3,880.0 1,745.0 uncut
220.0 304.0 84.0 1.33 7.9
SU-250 6257840N
426347E
-50/360 335.0 336.5 1.5 19.15 11.9
367.0 368.5 1.5 50.0 40.0
383.59 484.5 100.91 0.81 5.0
SU-252(3) 6257706N
426641E
-55/360 154.86 155.86 1.0 15.95 11.5
191.86 199 7.14 4.99 360.9
incl. 197.5 199.0 1.5 18.6 1,230.0
372.5 596.49 223.99 0.85 5.1
SU-253 6257880N
426691E
-58/360 178.3 184.5 6.2 5.27 9.0
319.5 325.5 6.0 7.49 4.0
SU-254(3) 6258051N
426507E
-55/150 203.0 224.0 21.0 3.05 8.7
incl. 203.0 204.5 1.5 22.1 26.7
264.0 348.99 84.99 1.44 4.1
incl. 274.72 275.72 1.0 35.6 57.5
SU-255 256.0 271.0 15.0 0.94 2.7
343.5 363.5 20.0 1.09 4.2
SU-256 6258088N
426430E
-50/180 122.5 148.0 25.5 1.6 8.7
SU-257 6257806N
426454E
-50/360 179.0 233.0 54.0 1.16 5.5
389.84 390.34 0.5 58.3 38.5
SU-259 6257840N
426347E
-58/360 202.5 215.5 13.0 11.35 27.5
incl. 204.0 205.5 1.5 75.7 60.0
398.5 433.0 34.5 1.96 5.0
incl. 431.5 433.0 1.5 17.1 19.0
507.0 508.5 1.5 264.0 274.0
526.5 528.0 1.5 40.2 17.8
SU-260 6257998N
426481E
-45/180 63.5 66.34 2.84 71.59 391.4 1 Au sample cut
incl. 63.5 65.0 1.5 92.0 38.6 uncut
incl. 65.84 66.34 0.5 17,750.0 7,780.0 uncut
112.5 144.0 31.5 1.12 9.4
WEST ZONE
SU-233 6258926N
426520E
-50/225 250.0 273.35 23.35 6.83 23.0
incl. 254.42 255.42 1.0 107.0 71.8
327.77 357.5 29.73 1.45 5.9
SU-240 6258784N
426519E
-50/225 39.6 43.33 3.73 2.15 614.0
72.0 95.5 23.5 0.89 73.9
174.0 287.0 113.0 1.29 12.7
SU-245 6258997N
426449E
-50/225 141.0 202.5 61.5 1.03 8.0
incl. 190.5 192.0 1.5 14.6 12.3
367.5 408.42 40.92 1.29 3.0
incl. 407.0 408.42 1.42 12.6 20.0
(1) True thickness to be determined.
(2) Unless otherwise indicated as uncut, all gold assays over 130 g/t were cut to 130 g/t and all silver assays over 2,100 g/t were cut to 2,100 g/t.
(3) Hole ended in mineralization.
(4) Holes SU-251 and SU-258 were metallurgical holes and not sampled.
(5) All samples were submitted for preparation and analysis by ALS Chemex at its facilities in Terrace, B.C. All samples were analyzed using multi-digestion with ICP finish. Samples over 100 ppm silver were reanalyzed using four acid digestion with an ore grade AA finish. Samples over 1,000 ppm silver were fire assayed with a gravimetric finish. Samples with over 10 ppm gold were fire assayed with a gravimetric finish. One in 10 samples was blank, one in 20 was a standard sample, and differing one in 20 samples was a field duplicate one-quarter split core assayed at ALS Chemex in Vancouver, B.C.

Kenneth C. McNaughton, M.A.Sc., P.Eng., Chief Exploration Officer, Pretium Resources Inc., is the Qualified Person (QP) responsible for the Brucejack Project exploration program.

About Pretivm

Pretivm is creating value through gold at its advanced-staged exploration projects Brucejack and Snowfield, located in northern British Columbia. Pretivm is advancing the high-grade, underground gold opportunity at Brucejack and the open pit opportunities at both Brucejack and Snowfield.

(SEDAR filings: Pretium Resources Inc.)

Forward-Looking Statement

This Press Release contains "forward-looking information" within the meaning of applicable Canadian securities legislation. Forward-looking information may include, but is not limited to, information with respect to our plans, costs and timing for future exploration (including updated resource estimates) and development activities, results of future exploration, timing and receipt of approvals, consents and permits under applicable legislation, production and developments in our operations in future periods and adequacy of financial resources. Wherever possible, words such as "plans", "expects" or "does not expect", "budget", "scheduled", "estimates", "forecasts", "anticipate" or "does not anticipate", "believe", "intend" and similar expressions or statements that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved, have been used to identify forward-looking information.

Statements concerning mineral resource estimates may also be deemed to constitute forward-looking information to the extent that they involve estimates of the mineralization that will be encountered if the property is developed. Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance (often, but not always, using words or phrases such as "expects", "anticipates", "plans", "projects", "estimates", "assumes", "intends", "strategy", "goals", "objectives", "potential" or variations thereof, or stating that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved, or the negative of any of these terms and similar expressions) are not statements of historical fact and may be forward-looking information. Forward-looking information is subject to a variety of known and unknown risks, uncertainties and other factors that could cause actual events or results to differ from those expressed or implied by the forward-looking information, including, without limitation, those risks identified in Pretivm's final short-form prospectus dated April 4, 2011 filed on SEDAR at www.sedar.com. Forward-looking information is based on the expectations and opinions of Pretivm's management on the date the statements are made. The assumptions used in the preparation of such statements, although considered reasonable at the time of preparation, may prove to be imprecise. We do not assume any obligation to update forward-looking information, whether as a result of new information, future events or otherwise, other than as required by applicable law. For the reasons set forth above, prospective investors should not place undue reliance on forward-looking information.

The TSX has neither approved nor disapproved of the information contained herein.

Contact Information:

Pretium Resources Inc.
Robert Quartermain
President and Chief Executive Officer
(604) 558-1784

Pretium Resources Inc.
Michelle Romero
Investor Relations Director
(604) 558-1784
invest@pretivm.com