Caledonia Mining Corporation: Results for the Third Quarter of 2014


TORONTO, ONTARIO--(Marketwired - Nov. 13, 2014) - Caledonia Mining Corporation ("Caledonia" or the "Company") (TSX:CAL)(OTCQX:CALVF)(AIM:CMCL) announces its operating and financial results for the third quarter ("Q3" or the "Quarter") and first nine months ("Nine Months") of 2014. All results are reported in Canadian dollars unless otherwise indicated. Following the implementation of indigenisation in September 2012, Caledonia owns 49% of the Blanket Mine in Zimbabwe. Caledonia continues to consolidate Blanket and the operational and financial information set out below is on a 100% basis unless indicated otherwise.

Operating and Financial Review

Quarter 3 Nine months to
September 30
2013 2014 2013 2014
Gold produced (oz) 12,042 9,890 34,102 31,354
On Mine cash cost (US$/oz)1 558 698 599 656
All-in sustaining cost ("AISC") (US$/oz)1 867 1,021 972 938
Gold Sales (oz) 12,042 9,890 35,594 33,323
Average realised gold price (US$/oz)1 1,330 1,256 1,435 1,266
Gross Profit ($'m)2 7.7 4.3 25.4 16.0
Net profit attributable to shareholders ($'m) 3.7 1.1 11.4 5.4
Adjusted basic earnings per share1 (cents) 7.2 1.0 25.1 8.8
Cash and cash equivalents ($'m) 23.9 26.9 23.9 26.9
Cash from operating activities ($'m) 5.3 3.6 9.9 11.5
Payments to the community and Zimbabwe government ($'m) 3.6 3.1 15.9 9.7
1 Measures such as "on-mine cash cost per ounce" "all-in sustaining cost per ounce" "average realised gold price" and "adjusted earnings per share" are non-IFRS measures and are discussed in Section 10 of the MD&A.
2 Gross profit is after deducting royalties, production costs and depreciation but before administrative expenses.

As previously advised, gold production at the Blanket Mine in the Quarter and Nine Months to September 30, 2014 was below expectations due to the lower than anticipated tonnage and head grade. Logistical constraints on 22 Level (750m below surface) restrict Blanket's ability to increase mined throughput to counterbalance the lower grade without restricting the development that is necessary to access resources below 750m. The revised investment plan that was announced on November 3, 2014, and which is summarised below, is expected to address this issue.

Blanket remains on track to achieve its target production of approximately 40,000 ounces of gold for 2014.

Lower production had an adverse effect on Caledonia's financial performance due to the high fixed cost component of Blanket's on-mine costs which means that at lower production levels, the fixed costs are spread over fewer production ounces with a resultant increase in the average unit cost of production. On-mine costs at Blanket remain low and are better than was expected, notwithstanding the lower head grade, primarily due to the improved metallurgical recovery and reduced cyanide consumption as a result of the re-introduction of oxygen sparging into the CIL circuit.

Caledonia's financial performance in Q3 was also adversely affected by the further decline in the gold price during this period and changes to the Zimbabwean taxation regime. The average achieved price per ounce of gold in the Quarter was US$1,256 compared to US$1,330 in Q3 of 2013. A revision to Zimbabwean tax regulations means that the gold royalty payable to the Zimbabwean government is no longer allowable for the purposes of calculating Zimbabwean income tax. However, from October 1 the effect of this change has been neutralized to an extent by a reduction in the gold royalty rate from 7% to 5%.

Notwithstanding Blanket's lower than anticipated production, Caledonia remained cash generative in the Quarter. Cash from operating activities in the Quarter was $3.6 million and Caledonia's cash and cash equivalents increased from C$25.8 million to C$26.9 million at the end of the Quarter.

Revised Investment Plan and Future Production Guidance

On November 3, 2014, Caledonia announced its revised investment plan ("Revised Plan") and production projections for the Blanket Mine.

Caledonia's Board and Management have completed a review of alternative expansion and diversification plans for Caledonia. Both the Board and Management have also addressed the revised production projections for the Blanket Mine and the possible benefits of diversifying Caledonia's production base.

Caledonia has concluded that the best returns on investment remain at the Blanket Mine in Zimbabwe, which continues to be cash generative in the current adverse market conditions and also offers significant investment returns that exceed alternative investment opportunities.

The objectives of the Revised Plan are to improve the underground infrastructure and logistics, which will allow an efficient and sustainable production build-up. The infrastructure improvements will include the development of a "Tramming Loop" on 22 Level (750m below shaft collar elevation) and the sinking of a new 6-meter diameter Central Shaft from surface to 1,080m.

The increased investment pursuant to the Revised Plan is expected to give rise to production from inferred resources amounting to approximately 70-75,000 ounces in 2021, this being in addition to projected production in 2021 from proven and probable mineral reserves of approximately 6,000 ounces. The Revised Plan is also expected to improve Blanket's long term operational efficiency, flexibility and sustainability.

A preliminary economic assessment (the "PEA") has been prepared in respect of the inferred resources which is preliminary in nature and includes inferred mineral resources that are considered too speculative geologically to have economic considerations applied to them that would enable them to be classified as mineral reserves. There is no certainty that the PEA will be realised. The PEA and a revised supporting NI43-101 Technical Report will be posted on SEDAR before December 17, 2014.

Caledonia's Dividend Policy

On November 25, 2013 Caledonia announced its revised dividend policy in terms of which it intends to pay a dividend of 6 Canadian cents per share in 2014, split into 4 equal quarterly payments of 1.5 Canadian cents per share. The first quarterly dividend was paid on January 31, 2014 and subsequent quarterly dividends were paid at the end of April, July and October 2014. It is currently envisaged that the existing dividend policy of 6 cents per annum, paid in equal quarterly instalments, will be maintained in 2015. Thereafter Caledonia will review its dividend policy for 2016, in terms of its operational performance and the prevailing market conditions. Caledonia will continue to maintain its strong financial position so that it can implement its stated growth strategy without the need to raise third party finance.

Commenting on these results, Stefan Hayden, Caledonia's President and Chief Executive Officer said:

"The revised Investment Plan for Blanket Mine, which was announced on November 3, 2014, addresses the logistical constraints on 22 Level which restrict the ability to increase production at the same time as increasing the necessary amount of development work.

"The new Central Shaft, which is expected to be completed in mid-2017, will allow Blanket to increase production in the medium term and will further enhance Blanket's operational efficiency. In the longer term, the Central Shaft will allow Blanket to undertake further exploration and development at deeper levels, which, if successful, will allow Blanket to continue operations into the middle of the 21st Century."

The full Report & Accounts, including the Management Discussion and Analysis for the quarter ended September 30, 2014 are available from the Company's website www.caledoniamining.com and from SEDAR.

Condensed Consolidated Statement of Profit or Loss and Other Comprehensive Income (unaudited)
(
In thousands of Canadian dollars except per share amounts)
For the 3 months
ended September 30
For the 9 months
ended September 30
2013 2014 2013 2014
$ $ $ $
Revenue 16,591 13,492 52,999 46,110
Royalty (1,165 ) (945 ) (3,651 ) (3,230 )
Production costs (6,872 ) (7,174 ) (21,493 ) (23,730 )
Depreciation (835 ) (1,029 ) (2,458 ) (3,112 )
Gross profit 7,719 4,344 25,397 16,038
Administrative expenses (1,153 ) (1,754 ) (5,853 ) (5,361 )
Foreign exchange gain. - 389 - 517
Gain on sale of property, plant and equipment - 52 57
Results from operating activities 6,566 3,031 19,544 11,251
Net finance expense (12 ) (16 ) (62 ) (86 )
Profit before income tax 6,554 3,015 19,482 11,165
Income tax expense (1,965 ) (1,747 ) (5,618 ) (4,284 )
Net profit for the period 4,589 1,268 13,864 6,881
(Loss)/profit on foreign currency translation (331 ) 2,562 2,216 2,408
Total comprehensive income for the period 4,258 3,830 16,080 9,289
Profit attributable to:
Owners of the Company 3,733 1,112 11,381 5,377
Non-controlling interests 856 156 2,483 1,504
4,589 1,268 13,864 6,881
Total comprehensive income attributable to:
Owners of the Company 3,052 3,637 13,619 7,769
Non-controlling interests 1,206 193 2,461 1,520
4,258 3,830 16,080 9,289
Earnings per share (cents)
Basic 7.2 2.2 21.9 10.5
Diluted 7.2 2.2 21.9 10.5
Adjusted earnings per share (cents)(i)
Basic 7.2 1.0 25.1 8.8
Diluted 7.2 1.0 25.1 8.8
(i) Adjusted earnings per share ("EPS") is a non-IFRS measure which aims to reflect Caledonia's ordinary trading performance. Refer to Section 10 of the Management Discussion and Analysis for a discussion of non-IFRS measures
Consolidated Statement of Cash Flows (unaudited)
(In thousands of Canadian dollars)
For 3 months ended
September 30
For 9 months ended
September 30
2013 2014 2013 2014
$ $ $ $
Cash flows from operating activities
Cash flows generated from continuing operations 7,067 5,057 18,138 15,453
Advance dividend paid - - (1,987 )
Tax paid (1,785 ) (1,410 ) (6,198 ) (3,851 )
Interest paid (12 ) (16 ) (62 ) (86 )
Net cash from operating activities 5,270 3,631 9,891 11,516
Cash flows from investing activities
Property, plant and equipment additions (3,362 ) (1,379 ) (8,470 ) (4,961 )
Proceeds from sale of property, plant and equipment - 72 - 72
Net cash used in investing activities (3,362 ) (1,307 ) (8,470 ) (4,889 )
Cash flows from financing activities
Dividends paid (488 ) (1,312 ) (5,938 ) (3,199 )
Proceeds from shares issued - - 470 -
Net cash from (used in) financing activities (488 ) (1,312 ) (5,468 ) (3,199 )
Net increase/(decrease) in cash and cash equivalents 1,420 1,012 (4,047 ) 3,428
Cash and cash equivalents at beginning of period 22,475 25,842 27,942 23,426
Cash and cash equivalents at end of period 23,895 26,854 23,895 26,854
Condensed Consolidated statements of Financial Position (unaudited)
(In thousands of
Canadian dollars)
As at December 31, September 30,
2013 2014
$ $
Total non-current assets 33,448 37,374
Inventories 6,866 6,877
Prepayments 177 261
Trade and other receivables 3,889 3,063
Cash and cash equivalents 25,222 27,852
Total current assets 36,154 38,053
Total assets 69,602 75,427
Total non-current liabilities 10,094 10,458
Trade and other payables 4,600 4,052
Bank overdraft 1,796 998
Income taxes payable 1,138 1,855
Total liabilities 17,628 17,366
Capital and reserves 51,974 58,064
Total equity and liabilities 69,602 75,427

Contact Information:

Caledonia Mining Corporation
Mark Learmonth
+27 11 447 2499
marklearmonth@caledoniamining.com
www.caledoniamining.com

Numis
John Prior/Paul Gillam/ James Black
+44 20 7260 1000

Blytheweigh
Tim Blythe/Halimah Hussain/Camilla Horsfall/George Yeomans
+44 20 7138 3204

WH Ireland
Adrian Hadden/James Bavister
+44 20 7220 1751