Eurotin Commences Deep Drilling Program on Its Oropesa Tin Project in Southwestern Spain


TORONTO, ONTARIO--(Marketwired - April 23, 2015) - Eurotin Inc. ("Eurotin" or the "Company") (TSX VENTURE:TIN) is pleased to announce it has commenced a deep drilling program, targeting mineralized structures from near surface to 400 metres in depth, at its Oropesa tin project located in southern Spain.

The first two holes are located 250 metres apart on Section Lines 12 and 17 and should be completed during the first half of May. Full assay results are expected approximately 2-3 weeks later. Upon completion of these holes and analysis of the results, the Company will then determine the extent and detail of the next phase of this drilling program.

Forward-Looking Statements

This press release includes certain forward-looking statements within the meaning of Canadian securities laws that are based on expectations, estimates and projections as of the date of this press release. There can be no assurance that such statements will prove accurate, and actual results and developments are likely to differ, in some case materially, from those expressed or implied by the forward-looking statements contained in this press release. Readers of this press release are cautioned not to place undue reliance on any such forward-looking statements.

Forward-looking statements contained in this press release are based on a number of assumptions that may prove to be incorrect, including, but not limited to: timely implementation of anticipated drilling and exploration programs; the successful completion of new development projects, planned expansions or other projects within the timelines anticipated and at anticipated production levels; the accuracy of reserve and resource estimates, grades, mine life and cash cost estimates; whether mineral resources can be developed; title to mineral properties; financing requirements, general market conditions, and the uncertainty of access to additional capital; changes in the world-wide price of mineral commodities; general economic conditions; and changes in laws, rules and regulations applicable to the Company. In addition to being subject to a number of assumptions, forward-looking statements in this press release involve known and unknown risks, uncertainties and other factors that may cause actual results and developments to be materially different from those expressed or implied by such forward-looking statements. The Company has no intention or obligation to update the forward-looking statements contained in this press release.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Contact Information:

Eurotin Inc.
David Danziger
CEO and President
416.515.3923
www.eurotin.ca