Press release 20 June 2019 | |
Flamanville EPR: EDF is reviewing decision from French Nuclear Safety Authority
EDF is reviewing the decision from the French Nuclear Safety Authority (ASN) notified in a letter dated 19 June 2019, related to the deviations affecting welds on the main steam transfer pipes covered by the break preclusion principle at the Flamanville EPR.
EDF is currently analysing the impact of this decision on the Flamanville EPR schedule and cost, and, in the upcoming weeks, it will give a detailed update on the next steps in the project.
N’imprimez ce message que si vous en avez l’utilité. EDF SA 22-30, avenue de Wagram 75382 Paris cedex 08 Capital de 1 505 133 838 euros 552 081 317 R.C.S. Paris www.edf.fr | CONTACTS Presse : 01 40 42 61 04 Analystes et Investisseurs : 01 40 42 40 38 |
This press release is certified. You can check that it’s genuine at medias.edf.com
A key player in energy transition, the EDF Group is an integrated electricity company, active in all areas of the business: generation, transmission, distribution, energy supply and trading, energy services. A global leader in low-carbon energies, the Group has developed a diversified generation mix based on nuclear power, hydropower, new renewable energies and thermal energy. The Group is involved in supplying energy and services to approximately 35,1 million customers1, including 26,5 million in France. The Group generated consolidated sales of €70 billion in 2017. EDF is listed on the Paris Stock Exchange.
Attachment