Osisko Intersects High-Grade at Windfall


Including 106 g/t Au Over 4.0 Metres in Lynx

Triple Lynx Extended 50 Metres Up Plunge to the SW and Vertically to NE

TORONTO, Jan. 09, 2020 (GLOBE NEWSWIRE) -- Osisko Mining Inc. (OSK:TSX. "Osisko" or the "Corporation") is pleased to provide new drilling results from the ongoing definition and expansion drill program at its 100% owned Windfall gold project located in the Abitibi greenstone belt, Urban Township, Eeyou Istchee James Bay, Québec.

The program is currently focused on infill drilling and expansion drilling at the Lynx deposit, exploration on the main mineralized zones, and deep exploration in the central areas of the mineralized intrusive system.

Osisko President and Chief Executive Officer John Burzynski commented: “We are very pleased with today’s results from Windfall, especially the continuing high-grade extension in Triple Lynx. Drilling continues to deliver positive results and demonstrate the strong continuity of grade inside the known mineralized zones, many of which remain open in at least one direction. The new intersections include the last batch of 2019 infill drilling which will be incorporated into the updated Windfall resource estimate anticipated in February.”

Significant new analytical results from 116 intercepts in 44 surface drill holes and 19 wedges focused on Lynx, Main Zone and Triple 8 infill and expansion drilling are presented below. Additionally, 71 intercepts from 45 underground infill drill holes are included in the table below.

Highlights from new results include:  266 g/t Au over 2.0 metres in OSK-W-1603-W5, 106 g/t Au over 4.0 metres in OSK-19-2139; 135 g/t Au over 2.5 metres in WST-19-0251; 114 g/t Au 2.5 metres in OSK-W-19-1965, 36.9 g/t Au over 5.0 metres in OSK-W-19-1104-W4;  83.8 g/t Au over 2.1 metres in WST-19-222A, 18.5 g/t Au over 9.0 metres in WST-19-0161A; 77.7 g/t Au over 2.1 metres in WST-19-0273A; 76.6 g/t Au over 2.1 metres in WST-19-0188 and 44.7 g/t Au over 3.2 metres in OSK-W-19-2170. Maps showing hole locations and full analytical results are available at www.osiskomining.com.

Surface Drilling

Hole No.From (m)To (m)Interval (m)Au (g/t) uncutAu (g/t) cut to 100 g/tZoneCorridor
OSK-W-18-1604715.3717.32.035.1 Lynx_336Lynx
including715.3716.31.066.9 
OSK-W-18-1731-W1871.1874.02.97.93 Lynx_313Lynx
including872.4873.00.621.3 
 895.5897.82.35.39 Lynx_327Lynx
OSK-W-19-991-W61215.91218.02.13.88 Lynx 4Lynx
OSK-W-19-1104-W4826.0828.02.04.14 Lynx 4Lynx
 840.9846.55.66.82 Lynx_313Lynx
including840.9841.60.729.1 
 856.0861.05.036.916.3Lynx 4Lynx
including858.2858.60.4357100
 906.5908.52.025.716.0Lynx 4Lynx
including907.5907.80.3165100
OSK-W-19-1272-W3799.0803.04.07.92 Triple LynxTriple Lynx
OSK-W-19-1603-W31411.1413.92.98.94 Triple 8Triple 8
 1453.51455.62.111.9 Triple 8Triple 8
including1453.51454.20.731.8 
 1459.51461.52.04.04 Triple 8Triple 8
 1477.71479.72.05.62 Triple 8Triple 8
 1550.81553.02.24.25 Triple 8Triple 8
including1552.01552.40.413.2 
 1558.01560.22.24.92 Triple 8Triple 8
OSK-W-19-1603-W41622.31624.82.59.17 Triple 8Triple 8
OSK-W-19-1603-W51542.01544.02.04.96 Triple 8Triple 8
including1542.51542.80.315.7 
 1612.01614.02.026650.1Triple 8Triple 8
including1612.01613.01.0531100
 1633.31635.32.019.0 Triple 8Triple 8
including1633.91634.70.844.0 
 1680.81683.02.27.08 Triple 8Triple 8
including1681.41681.90.529.6 
 1711.71713.92.29.85 Triple 8Triple 8
OSK-W-19-1783-W31629.81632.42.65.48 Triple 8Triple 8
 2019.42021.82.46.65 Triple 8Triple 8
 2185.02187.52.54.49 Triple 8Triple 8
including2186.12186.50.425.7 
OSK-W-19-1835-W3604.7607.02.33.06 UnderdogUnderdog
 746.0748.02.03.43 UnderdogUnderdog
 915.0917.02.03.33 UnderdogUnderdog
 1144.01146.02.04.04 UnderdogUnderdog
 1186.41196.510.14.85 UnderdogUnderdog
including1192.71193.40.717.1 
OSK-W-19-1867260.9263.62.73.26 F51F51
OSK-W-19-1882798.0800.42.47.60 UnderdogUnderdog
including799.7800.40.722.1 
OSK-W-19-1933303.0305.02.03.40 Caribou_201Caribou
 396.0398.12.14.53 Caribou_207Caribou
 508.5512.03.53.96 Z27_112Zone 27
 524.0526.72.74.91 Z27_110Zone 27
OSK-W-19-1942-W2906.0908.22.24.81 Lynx_327Lynx
including907.8908.20.417.9 
OSK-W-19-1963-W21122.01124.02.06.24 Lynx 4Lynx
OSK-W-19-1963-W61402.71406.63.923.8 Lynx 4Lynx
including1405.11406.61.544.8 
 1411.81414.02.23.94 Lynx 4Lynx
OSK-W-19-1965116.0118.52.511434.8Windfall NordWindfall Nord
including117.3118.10.8346100
OSK-W-19-1969198.0200.02.03.06 Lynx corridorLynx
including199.0200.01.05.64 
OSK-W-19-197383.285.52.35.29 Caribou_220Caribou
including84.284.50.340.5 
 92.295.12.94.37 Caribou_220Caribou
including94.895.10.323.7 
 387.0389.02.04.51 Caribou_201Caribou
 415.2418.02.85.91 Z27 corridorZone 27
OSK-W-19-19881583.21585.42.29.52 Triple 8Triple 8
 1690.81693.02.25.97 Triple 8Triple 8
 1771.01773.22.26.17 Triple 8Triple 8
 1779.01783.04.06.02 Triple 8Triple 8
OSK-W-19-1988-W11596.01598.02.09.05 Triple 8Triple 8
 1794.81796.82.05.66 Triple 8Triple 8
including1795.31795.70.424.7 
OSK-W-19-1993103.1105.52.45.14 F11F11
OSK-W-19-1995400.1402.42.34.16 Caribou_230Caribou
 501.0503.52.512.2 Caribou_207Caribou
including501.0502.01.030.3 
OSK-W-19-199613.015.12.13.67 BobcatBobcat
OSK-W-19-1998100.9104.03.112.6 F11F11
including103.0104.01.030.0 
OSK-W-19-2001119.5121.72.216.8 F11F11
including119.5120.10.643.6 
 125.4127.72.37.81 F11F11
OSK-W-19-2019149.0151.02.017.5 F11F11
including149.0150.01.034.8 
OSK-W-19-2020223.3225.42.13.95 BobcatBobcat
including224.9225.40.514.4 
OSK-W-19-202158.460.42.04.08 F11F11
including60.060.40.417.4 
OSK-W-19-202499.0101.02.012.9 F11F11
including100.0101.01.024.3 
 108.6110.62.04.24 F11F11
OSK-W-19-202721.027.06.04.46 F11F11
 29.932.52.63.20 F11F11
OSK-W-19-203172.074.22.214.9 BobcatBobcat
including73.474.20.837.7 
OSK-W-19-2055210.8213.02.212.4 F51F51
including211.6211.90.380.3 
 280.9283.02.17.50 F51F51
OSK-W-19-2061453.0455.02.04.72 LynxLynx
OSK-W-19-2066261.5263.72.259.1 F51F51
including261.8263.41.679.2 
OSK-W-19-20671144.01146.02.03.16 Triple LynxTriple Lynx
OSK-W-19-2067-W41049.01053.34.33.70 Triple LynxTriple Lynx
 1068.51072.03.56.88 Triple LynxTriple Lynx
 1106.01109.03.012.2 Triple LynxTriple Lynx
 1115.01117.52.55.46 Triple LynxTriple Lynx
 1123.01126.63.615.4 Triple LynxTriple Lynx
including1124.01125.01.037.4 
 1134.01139.05.05.56 Triple LynxTriple Lynx
OSK-W-19-2068516.8519.02.24.17 LynxLynx
OSK-W-19-2080153.7155.72.08.68 F51F51
including153.7154.20.520.5 
 199.6203.23.628.2 F51F51
including199.6200.00.443.9 
and202.2203.21.070.7 
 211.0213.32.35.09 F51F51
OSK-W-19-208138.140.42.344.739.4BobcatBobcat
including38.139.00.9114100
OSK-W-19-2082151.0154.03.05.11 BobcatBobcat
OSK-W-19-2083115.0117.02.03.67 CaribouCaribou
including115.5116.51.06.93 
OSK-W-19-2086280.0282.02.06.76 F51F51
including281.0281.50.518.7 
OSK-W-19-2087215.4217.42.04.59 F51F51
OSK-W-19-2100-W4967.5970.02.59.80 Triple LynxTriple Lynx
including969.7970.00.356.6 
OSK-W-19-2101721.0724.73.79.33 Triple LynxTriple Lynx
including724.3724.70.432.0 
OSK-W-19-210499.5102.22.73.13 F11F11
OSK-W-19-2107-W2578.5580.62.112.2 Lynx_331Lynx
including579.8580.20.428.7 
 890.0892.02.03.82 Triple LynxTriple Lynx
OSK-W-19-2108-W21346.21348.52.36.50 Triple LynxTriple Lynx
OSK-W-19-2120-W31052.41054.82.43.33 Lynx 4Lynx
OSK-W-19-2139892.4899.87.46.93 Triple LynxTriple Lynx
including896.0897.01.022.9 
 956.6960.64.010646.5Triple LynxTriple Lynx
including959.8960.30.5566100
 964.0966.02.03.19 Triple LynxTriple Lynx
OSK-W-19-2139-W2876.7879.02.322.9 Triple LynxTriple Lynx
including876.7877.20.584.7 
 927.4929.52.14.99 Triple LynxTriple Lynx
including927.4928.10.712.5 
 1077.01079.02.03.03 Triple LynxTriple Lynx
 1083.01085.32.35.66 Triple LynxTriple Lynx
OSK-W-19-2160743.0745.02.03.37 LynxLynx
OSK-W-19-2170960.3963.02.735.5 Triple LynxTriple Lynx
including960.9961.80.970.6 
 1016.71018.82.13.96 Triple LynxTriple Lynx
 1022.81026.03.244.716.4Triple LynxTriple Lynx
including1022.81023.10.3402100
OSK-W-19-2178367.0369.32.313.4 Lynx_301Lynx
including367.5368.30.837.5 
OSK-W-19-2181117.0119.12.14.11 Lynx_305Lynx
including117.0117.30.320.0 
 150.6153.22.610.2 Lynx_307Lynx
OSK-W-19-2183441.0443.12.18.41 Lynx_301Lynx
including441.0441.50.517.9 
OSK-W-19-218497.099.42.418.0 Lynx_308Lynx
including98.598.90.489.9 
OSK-W-19-218662.064.12.114.4 LynxLynx
including62.062.30.387.0 
 83.085.02.06.42 Lynx_308Lynx
including84.284.50.341.3 
OSK-W-19-218853.855.92.15.01 Lynx_306Lynx
including53.854.10.333.2 
 93.095.02.07.50 Lynx_308Lynx
OSK-W-19-219152.755.12.45.68 Lynx_310Lynx
including54.054.30.337.3 
OSK-W-19-219360.062.22.24.29 Lynx_308Lynx
including61.661.90.319.7 
OSK-W-19-2195336.9339.02.118.8 Lynx_301Lynx
including336.9338.01.132.2 

Notes: True widths are estimated at 55 – 80% of the reported core length interval. See "Quality Control and Reporting Protocols" below.

Underground Drilling

Hole No.From (m)To (m)Interval (m)Au (g/t) uncutAu (g/t) cut to 100 g/tZoneCorridor
WST-19-002944.046.02.03.65 Z27_103Zone 27
WST-19-003055.057.02.03.33 Z27_103Zone 27
 81.083.02.07.91 Z27_104Zone 27
WST-19-003364.066.52.56.24 Z27_103Zone 27
including65.165.90.819.0 
WST-19-0076115.3117.62.33.22 Z27 corridorZone 27
WST-19-0160A83.987.53.68.04 Z27_113Zone 27
WST-19-0161A61.065.04.08.71 Z27_113Zone 27
including61.062.01.019.8 
 101.0110.09.018.5 Z27_115Zone 27
including105.0107.02.062.3 
WST-19-016266.970.94.05.85 Z27 corridorZone 27
including68.769.20.518.4 
WST-19-018337.039.02.03.92 Z27_103Zone 27
including37.838.20.419.1 
WST-19-018479.181.12.04.41 Z27_104Zone 27
including80.080.80.810.5 
WST-19-018635.037.02.04.17 Z27_103Zone 27
including36.336.60.327.2 
WST-19-0187108.4110.52.16.02 Z27_115Zone 27
including109.7110.00.340.4 
WST-19-018862.067.05.03.46 CaribouCaribou
including63.564.10.612.4 
 98.0100.02.04.93 Z27_101Zone 27
 106.9109.02.176.639.1Z27_115Zone 27
including106.9107.70.8199100
WST-19-0189103.0105.02.08.22 Z27_101Zone 27
including103.7104.60.916.6 
 107.9110.02.13.08 Z27_115Zone 27
WST-19-0190110.4113.83.43.42 Z27_115Zone 27
WST-19-019185.487.62.29.13 Z27_101Zone 27
including87.087.60.630.9 
WST-19-019271.073.32.33.31 Caribou_201Caribou
including73.073.30.312.0 
 96.299.02.89.05 Z27_115Zone 27
 103.2105.52.37.08 Z27_115Zone 27
including104.6105.50.916.6 
WST-19-019356.058.02.03.34 Caribou_203Caribou
 127.4129.92.59.26 Z27_115Zone 27
WST-19-0194136.5138.62.16.42 Z27_115Zone 27
including137.0137.80.814.2 
WST-19-0210130.0132.02.07.30 LynxLynx
including130.0131.01.014.5 
WST-19-0214214.4216.72.36.72 Caribou_201Caribou
WST-19-0219274.0276.02.03.98 Caribou corridorCaribou
WST-19-022074.977.02.18.46 Z27_116Zone 27
including74.975.30.440.4 
 135.0137.12.14.01 Caribou_201Caribou
including136.6137.10.516.3 
 235.0237.02.05.24 Caribou_238Caribou
including235.5235.90.422.0 
WST-19-0221119.0121.02.014.5 Caribou_207Caribou
including119.8120.10.396.3 
WST-19-0222A228.0230.02.04.52 Caribou_206Caribou
 236.0238.02.06.66 Caribou_206Caribou
including236.0237.01.013.1 
 292.0294.42.43.07 Caribou_217Caribou
 302.5304.62.183.819.3Caribou_217Caribou
including304.2304.60.4439100
WST-19-0223273.0275.02.03.46 Caribou_225Caribou
WST-19-0224204.4209.55.112.6 Caribou_231Caribou
including204.4205.51.144.2 
WST-19-0225199.1201.42.34.64 Caribou corridorCaribou
WST-19-0226109.0111.42.446.443.1Z27_101Zone 27
including109.0110.01.0108100
WST-19-0227218.7220.72.026.7 Caribou_218Caribou
including218.7219.50.863.5 
 234.0236.02.03.18 Caribou_201Caribou
WST-19-024412.015.33.38.22 Lynx_310Lynx
including15.015.30.343.2 
 37.039.02.021.116.3Lynx_305Lynx
including37.838.10.3132100
 40.644.03.426.9 Lynx_304Lynx
WST-19-024517.119.92.88.54 Lynx_310Lynx
including17.117.40.352.4 
WST-19-024658.060.12.13.55 Lynx_306Lynx
including59.360.10.89.15 
WST-19-024740.642.62.029.8 Lynx_304Lynx
including40.641.40.873.5 
WST-19-024835.638.12.55.76 Lynx_304Lynx
including36.336.60.342.2 
WST-19-025070.072.02.04.02 Lynx_308Lynx
including70.670.90.326.1 
 77.480.02.630.219.9Lynx_308Lynx
including78.278.50.3189100
 97.599.82.33.05 Lynx_310Lynx
including98.398.70.416.3 
 125.0127.02.08.30 LynxLynx
including125.0125.30.355.3 
WST-19-025169.872.32.513532.1Lynx_308Lynx
including69.870.60.8422100
WST-19-025268.570.62.17.31 Lynx_308Lynx
including70.370.60.339.4 
 75.777.92.28.78 Lynx_308Lynx
including77.677.90.337.1 
 90.993.02.16.29 Lynx_310Lynx
including92.092.60.621.9 
WST-19-025370.472.72.338.4 Lynx_308Lynx
including71.972.70.872.9 
 121.0123.12.18.32 Lynx_304Lynx
including122.7123.10.441.9 
 149.9152.32.47.49 LynxLynx
including150.5151.00.535.3 
WST-19-025459.361.72.417.113.6Lynx_311Lynx
including61.461.70.3129100
 69.071.62.65.84 Lynx_308Lynx
WST-19-026318.020.32.34.26 Lynx_305Lynx
including19.319.70.424.2 
 49.952.42.58.46 Lynx_304Lynx
including51.251.80.622.1 
WST-19-027281.083.42.49.29 Lynx_304Lynx
including83.183.40.372.5 
WST-19-0273A91.093.12.177.734.7LynxLynx
including91.392.00.7229100
WST-19-027685.988.32.417.817.1Lynx_316Lynx
including86.687.00.4105100
 97.299.32.16.38 Lynx_306Lynx
including97.898.10.342.3 
WST-19-027795.097.32.34.91 Lynx_341Lynx
including96.797.30.615.1 
WST-19-027891.993.92.07.27 Lynx_316Lynx

Notes: True widths are estimated at 55 – 80% of the reported core length interval. See "Quality Control and Reporting Protocols" below.

Drill hole location

Hole NumberAzimuth (°)Dip (°)Length (m)UTM EUTM NElevationSection
OSK-W-18-1604142-5290945321954353474073575
OSK-W-18-1731-W1139-5199545338354355184093800
OSK-W-19-991-W6128-58176145398054359934014550
OSK-W-19-1104-W4142-5093345338354354554023775
OSK-W-19-1272-W3127-60116445324654355354123675
OSK-W-19-1603-W335-80174345334054345433963275
OSK-W-19-1603-W435-80174045334054345433963275
OSK-W-19-1603-W535-80179145334054345433963275
OSK-W-19-1783-W361-78220845353554343733983375
OSK-W-19-1835-W3173-53130845230554354744062825
OSK-W-19-1867334-4954845376054357584014250
OSK-W-19-1882328-5791545246954344054002450
OSK-W-19-1933333-5460245257854347134042700
OSK-W-19-1942-W2128-54105645331554353904033675
OSK-W-19-1963-W2123-58142445376154358164014275
OSK-W-19-1963-W6123-58149345376154358164014275
OSK-W-19-1965352-4823145220154351484052575
OSK-W-19-1969164-5133645283254349474053025
OSK-W-19-1973325-5050945239254345473992450
OSK-W-19-198848-78196245337454344803963275
OSK-W-19-1988-W148-78181245337454344803963275
OSK-W-19-1993146-5419245235054358504063050
OSK-W-19-1995336-5956445281854347753972950
OSK-W-19-1996177-5516545280854349124043000
OSK-W-19-1998151-4618345235054358504063050
OSK-W-19-2001166-5320145240254358764063100
OSK-W-19-2019153-5123445240754359194063125
OSK-W-19-2020163-4529445272754349294072950
OSK-W-19-2021152-4919245253454359144103250
OSK-W-19-2024165-4516245241554358544063100
OSK-W-19-2027154-4610245227454357324072925
OSK-W-19-2031271-687845299554351064183250
OSK-W-19-2055337-4629145360854357124034075
OSK-W-19-2061150-4846845278354350074073025
OSK-W-19-2066159-4542945348654360284044125
OSK-W-19-2067123-53121245324154356974163750
OSK-W-19-2067-W4123-53120345324154356974163750
OSK-W-19-2068116-53109845331754353874023675
OSK-W-19-2080157-4643445354154360094044175
OSK-W-19-2081152-4729145283854350474073100
OSK-W-19-2082329-5821945303654351094143300
OSK-W-19-2083359-4659745195954343504031975
OSK-W-19-2086145-4538745360354361234094275
OSK-W-19-2087341-4434845363554357294034125
OSK-W-19-2100-W4122-47126045309354357264193650
OSK-W-19-210118-6890945342654347793963475
OSK-W-19-2104149-4529145249454359374063225
OSK-W-19-2107-W223-7093245342654347783963475
OSK-W-19-2108-W2117-53157845321554358584143825
OSK-W-19-2120-W3114-60124745380054357474014275
OSK-W-19-2139115-52114945298054355494203450
OSK-W-19-2139-W2115-52120345298054355494203450
OSK-W-19-2160124-50103245308754355274043550
OSK-W-19-2170128-59120345342554356574133900
OSK-W-19-2178132-4641645350454354283993850
OSK-W-19-2181333-4820745317954349113973325
OSK-W-19-2183135-4948545350454354283993850
OSK-W-19-2184334-5012045321154349673983375
OSK-W-19-2186332-4513545321154349683983375
OSK-W-19-2188323-4712045321154349683983375
OSK-W-19-2191327-549345319754349943993375
OSK-W-19-2193333-459045319754349953983375
OSK-W-19-2195134-4542045350354354303993850
WST-19-0029148-2715145228154349742632575
WST-19-00301284011745228254349742672575
WST-19-0033108-111845228254349752642575
WST-19-00761334115945220854348982502475
WST-19-0160A324-4922545223454347102082400
WST-19-0161A311-3813245223454347102082400
WST-19-0162346-5425545223654347112082400
WST-19-0183148410645228154349742642575
WST-19-0184128-510645228154349752642575
WST-19-01861552110645228154349742652575
WST-19-0187320613945211854346061872250
WST-19-0188320-3714545211854346061862250
WST-19-01893261613945211954346061872250
WST-19-0190331-3115345211954346061852250
WST-19-0191336-912445211954346061862250
WST-19-0192336-2113045211954346061862250
WST-19-0193317-4215145219354346611992325
WST-19-0194340-4716345219454346621992325
WST-19-02101872215745317654351251753425
WST-19-0214135-1229245228154349752642575
WST-19-02191421731045215754348572422400
WST-19-0220142625245215754348572422400
WST-19-0221147-325345215754348572412400
WST-19-0222A145532245220854348982492475
WST-19-0223145-1339145220854348982482475
WST-19-0224132631645220854348992492475
WST-19-0225132-932945220854348992492475
WST-19-0226141-1531645228154349742632575
WST-19-0227124-1734045228154349742632575
WST-19-0244124237345330654350632053500
WST-19-0245138496945330654350632063500
WST-19-0246143407345330654350632063500
WST-19-0247155337345330654350632053500
WST-19-0248155207345330654350632053500
WST-19-0250139816345321754351152243450
WST-19-02511431715545321754351152243450
WST-19-02521431215745321754351152243450
WST-19-0253143615745321754351152243450
WST-19-0254143116845321754351152233450
WST-19-0263161810645329854350662053500
WST-19-02721382511245329054351162063525
WST-19-0273A1381111445329054351162063525
WST-19-02761262011145329154351162063525
WST-19-02771112711745329154351172073525
WST-19-0278111614145329154351162063525
        

OSK-W-18-1604 intersected 35.1 g/t Au over 2.0 metres in Lynx. Mineralization consists of 1% pyrite with pervasive silica flooding in a moderate sericite and silica altered and bleached rhyolite.

OSK-W-18-1731-W1 intersected 7.93 g/t Au over 2.9 metres and 5.39 g/t Au over 2.3 metres in Lynx. The first interval consists of trace pyrite stringers in a moderate silica and weak sericite altered rhyolite. The second interval consists of 1% pyrite stringers and chalcopyrite with a quartz-carbonate vein. Both are hosted is a moderate chlorite altered gabbro.

OSK-W-19-991-W6 intersected 3.88 g/t Au over 2.1 metres in Lynx. Mineralization consists of 6% disseminated pyrite and 2% pyrite stringers with local silica alteration hosted in a chloritized gabbro.

OSK-W-19-1104-W4 intersected 4.14 g/t Au over 2.0 metres, 6.82 g/t Au over 5.6 metres, 36.9 g/t Au over 5.0 metres and 25.7 g/t Au over 2.0 metres in Lynx. The first interval consists of 3% disseminated, stringer, and clustered pyrite with smoky quartz veinlets and pervasive silica flooding hosted in a weak sericite and moderate silica altered rhyolite. The second interval consists of local visible gold, 3% disseminated pyrite with silica flooding, and 1% disseminated and stringer pyrite hosted in a moderate silica and sericite altered rhyolite. The third interval consists of local visible gold within quartz-carbonate veinlets or with 1% pyrite stringers, and 1% disseminated pyrite in a weak silica and sericite altered rhyolite. The fourth interval consists of local visible gold and 1% disseminated pyrite with pervasive silica flooding hosted in a moderate to strong silica altered rhyolite.

OSK-W-19-1272-W3 intersected 7.92 g/t Au over 4.0 metres in Triple Lynx. Mineralization consists of local visible gold and trace pyrite in a quartz veinlet hosted in a weak sericite altered porphyritic felsic intrusion.

OSK-W-19-1603-W3 intersected 8.94 g/t Au over 2.9 metres, 11.9 g/t Au over 2.1 metres, 4.04 g/t Au over 2.0 metres, 5.62 g/t Au over 2.0 metres, 4.25 g/t Au over 2.2 metres and 4.92 g/t Au over 2.2 metres  in Triple 8. The first interval consists of 15% disseminated, clustered and semi-massive pyrite with local electrum in a moderate chlorite-biotite-sericite-silica and carbonate altered andesite. The second and third intervals consist of 30% pyrite clusters up to semi-massive pyrite, 10% pyrrhotite with quartz-carbonate veins, 5% disseminated pyrite, 1% disseminated pyrrhotite and trace sphalerite in a moderate chlorite-biotite altered gabbro. The fourth interval consists of 10% pyrite stringers, 5% disseminated pyrite, 1% pyrite clusters, and 1% disseminated pyrrhotite in a moderate chlorite-biotite-silica altered and bleached andesite at the contact with a gabbro. The fifth interval consists of trace disseminated pyrite and quartz-tourmaline veins in a moderate biotite-carbonate altered andesite. The sixth interval consists of 6% pyrite stringers and 4% disseminated pyrite in a weak silica altered and bleached andesite.

OSK-W-19-1603-W4 intersected 9.17 g/t Au over 2.5 metres in Triple 8. Mineralization consists of up to 40% disseminated pyrite to local net-like texture and 1% pyrite stringers with pervasive silica-carbonate flooding in a moderate sericite altered and sheared contact between an andesite and a felsic dike.

OSK-W-19-1603-W5 intersected 4.96 g/t Au over 2.0 metres, 266 g/t Au over 2.0 metres, 19.0 g/t Au over 2.0 metres, 7.08 g/t Au over 2.2 metres and 9.85 g/t Au over 2.2 metres in Triple 8. The first interval consists of trace pyrite stringers and 2% pyrite in pervasive silica flooding in a moderate sericite and weak silica altered and bleached rhyolite. The second interval consists of 1% disseminated and stringer pyrite in a moderate andesite (the grade is usually high for this type of host, investigations are on-going). The third interval consists of local visible gold and 15% disseminated, clustered and stringer pyrite and 1% chalcopyrite clusters with quartz-carbonate veins hosted at the contact between a moderate sericite altered and bleached gabbro and an andesite. The fourth interval consists of 3% pyrite stringers and 1% pyrite clusters in a moderate biotite and weak sericite altered bleached and foliated porphyritic felsic dike. The fifth interval consists of 15% disseminated, clustered and stringer pyrite, local disseminated chalcopyrite with smoky quartz veins, and quartz-tourmaline veins in a moderate sericite and strong silica altered porphyritic felsic dike.

OSK-W-19-1783-W3 intersected 5.48 g/t Au over 2.6 metres, 6.65 g/t Au over 2.4 metres, and 4.49 g/t Au over 2.5 metres in Triple 8. The first interval consists of 4% pyrite stringers, 6% disseminated pyrite, and 2% disseminated and stringer pyrrhotite in a moderate sericite and silica altered andesite. The second interval consists of local visible gold with a quartz-carbonate vein, 5% disseminated, clustered and stringer pyrite, and 2% pyrite-pyrrhotite stringers in a moderate sericite and weak chlorite altered porphyritic felsic dike. The third interval consists of trace disseminated and stringer pyrite with quartz-carbonate veins in a moderate sericite altered porphyritic felsic dike.

OSK-W-19-1835-W3 intersected 3.06 g/t Au over 2.3 metres, 3.43 g/t Au over 2.0 metres, 3.33 g/t Au over 2.0 metres, 4.04 g/t Au over 2.0 meters and 4.85 g/t Au over 10.1 metres in Underdog. The first interval consists of 50% semi-massive to massive pyrite and 10% clustered and stringer pyrite with quartz veins in a strong silica altered andesite. The second interval consists of 8% disseminated pyrite in a weak silica-sericite altered porphyritic felsic dike. The third interval consists 15% disseminated pyrite with ptygmatic tourmaline veins in a moderate silica-sericite altered porphyritic felsic dike. The four interval consists of 3% disseminated pyrite and trace pyrite stringers in a weak silica-sericite altered porphyritic felsic dike. The fifth interval consists of 15% pyrite stringers and 5% disseminated pyrite hosted in moderate sericite and altered and bleached fragmental felsic intrusion.

OSK-W-19-1867 intersected 3.26 g/t Au over 2.7 metres in F-51. Mineralization consists of 1% disseminated pyrite hosted in a moderate sericite-silica-carbonate and weak fuchsite altered rhyolite.

OSK-W-19-1882 intersected 7.60 g/t Au over 2.4 metres in Underdog. Mineralization consists of 5% disseminated pyrite and trace chalcopyrite stringers with pervasive silica flooding hosted in a moderate sericite porphyritic felsic dike.

OSK-W-19-1933 intersected 3.40 g/t Au over 2.0 metres and 4.53 g/t Au over 2.1 metres in Caribou and 3.96 g/t Au over 3.5 metres and 4.91 g/t Au over 2.7 metres in Zone 27. The first interval consists of 10% pyrite stringers hosted in a moderate sericite and weak silica altered porphyritic felsic dike. The second interval consists of 8% pyrite stringers and clusters hosted in a moderate sericite altered and bleached andesite. The third interval consists of 7% pyrite stringers and 3% pyrite clusters hosted in a moderate sericite-silica altered porphyritic felsic porphyritic dike. The fourth interval consists of 3% pyrite stringers and 1% pyrite clusters in a moderate sericite altered porphyritic dike.

OSK-W-19-1942-W2 intersected 4.81 g/t Au over 2.2 metres in Lynx.  Mineralization consists of 2% pyrite stringers and 1% disseminated pyrite hosted in a moderate sericite altered rhyolite.

OSK-W-19-1963-W2 intersected 6.24 g/t Au over 2.0 metres in Lynx. Mineralization consists of 5% disseminated and stringer pyrite in a moderate chlorite altered, foliated and weakly bleached porphyritic felsic dike.

OSK-W-19-1963-W6 intersected 23.8 g/t Au over 3.9 metres and 3.94 g/t Au over 2.2 metres in Lynx.  The first interval consists of up to 3% disseminated, stringer, clustered, and fragmented pyrite, up to 3% sphalerite, and local silver, arsenopyrite and chalcopyrite with pervasive silica flooding hosted in a moderate to strong silica and moderate sericite altered rhyolite with breccia texture. The second interval consists of up to 5% disseminated, stringer, and clustered pyrite with pervasive silica flooding and smoky quartz veinlets, and trace pyrite with ptygmatic tourmaline veins and quartz-carbonate veinlets hosted in a moderate to strong chlorite-sericite and moderate silica altered rhyolite.

OSK-W-19-1965 intersected 114 g/t Au over 2.5 metres in Windfall North. Mineralization consists of local visible gold with a crustiform quartz-carbonate vein and 5% pyrite stringers in a moderate silica-sericite and weak fuchsite altered and bleached andesite.

OSK-W-19-1969 intersected 3.06 g/t Au over 2.0 metres in Lynx. Mineralization consists of trace disseminated pyrite with quartz-carbonate veins in a weak sericite altered porphyritic felsic dike.

OSK-W-19-1973 intersected 5.29 g/t Au over 2.3 metres, 4.37 g/t Au over 2.9 metres, 4.51 g/t Au over 2.0 metres in Caribou and 5.91 g/t Au over 2.8 metres in Zone 27. The first interval consists of local visible gold, trace pyrite, chalcopyrite and molybdenite, and trace tourmaline veinlets and quartz-carbonate veins hosted in weak chlorite and moderate hematite altered andesite. The second interval consists of 1% disseminated pyrite and 1% pyrite with quartz-carbonate veins in a moderate silica and weak sericite altered andesite. The third interval consists of 3% pyrite stringers, trace pyrrhotite with local tourmaline ptygmatic veinlets, and disseminated pyrite in a moderate sericite altered and bleached gabbro at the contact with porphyritic felsic dike. The fourth interval consists of 2% pyrite in tourmaline ptygmatic vein and 1% pyrite stringers in a moderate sericite altered, bleached and foliated andesite.

OSK-W-19-1988 intersected 9.52 g/t Au over 2.2 metres, 5.97g/t Au over 2.2 metres, 6.17 g/t Au over 2.2 metres and 6.02 g/t Au over 4.0 metres in Triple 8. The first interval consists of 15% pyrite clusters, 5% pyrite-tourmaline stringers, 1% interstitial pyrrhotite, and local sphalerite hosted in a strong silica and moderate chlorite and biotite altered andesite. The second interval consists of 5% pyrite stringers and 2% pyrite clusters in a moderate silica-chlorite and weak sericite altered porphyritic dike. The third interval consists of 6% pyrite stringers with pervasive silica flooding, trace disseminated pyrrhotite and chalcopyrite in a moderate silica and foliated basalt. The fourth interval consists of 9% pyrite stringers and 1% pyrite clusters in a weak sericite-silica altered dacite.

OSK-W-19-1988-W1 intersected 9.05 g/t Au over 2.0 metres and 5.66 g/t Au over 2.0 metres in Triple 8. The first interval consists of local visible gold, 35% disseminated, clustered and stringer pyrite, 1% sphalerite stringers, and 1% sphalerite with a smoky quartz vein hosted in a moderate chlorite and weak silica altered and bleached andesite. The second interval consists of trace disseminated pyrite hosted in a moderate silica-carbonate and weak sericite altered porphyritic felsic dike.

OSK-W-19-1993 intersected 5.14 g/t Au over 2.4 metres in F-11. Mineralization consists of 1% disseminated pyrite in a moderate chlorite-carbonate altered andesite.

OSK-W-19-1995 intersected 4.16 g/t Au over 2.3 metres and 12.2 g/t Au over 2.5 metres in Caribou. The first interval consists of 2% pyrite stringers, quartz ±tourmaline veins, 1% pyrite clusters and trace disseminated pyrite in a moderate sericite altered rhyolite. The second interval consists of 1% pyrite stringers and trace disseminated pyrite in a moderate sericite porphyritic felsic dike.

OSK-W-19-1996 intersected 3.67 g/t Au over 2.1 metres in Bobcat. Mineralization consists of trace disseminated and stringer pyrite in a weak sericite altered porphyritic felsic dike.

OSK-W-19-1998 intersected 12.6 g/t Au over 3.1 metres in F-11. Mineralization consists of trace disseminated pyrite in a moderate chlorite altered andesite.

OSK-W-19-2001 intersected 16.8 g/t Au over 2.4 metres and 7.81 g/t Au over 2.3 metres in F-11. The first interval consists of local visible gold with trace pyrite clusters, 7% disseminated and stringer pyrite hosted in a weak silica altered and bleached andesite. The second interval consists of local visible gold, trace pyrite clusters with local carbonate-quartz blebs in a weak silica altered andesite.

OSK-W-19-2019 intersected 17.5 g/t Au over 2.0 metres in F-11. Mineralization consists of trace disseminated pyrite with quartz-carbonates veins in a moderate chlorite-carbonate altered andesite.

OSK-W-19-2020 intersected 3.95 g/t Au over 2.1 metres in Bobcat. Mineralization consists of 1% ptygmatic tourmaline veins and 2% disseminated pyrite in a moderate sericite-chlorite and weak silica altered gabbro.

OSK-W-19-2021 intersected 4.08 g/t Au over 2.0 metres in F-11. Mineralization consists of 2% disseminated pyrite in a moderate sericite-carbonate altered andesite.

OSK-W-19-2024 intersected 12.9 g/t Au over 2.0 metres and 4.24 g/t Au over 2.0 metres in F-11. The first interval consists of trace pyrite with quartz-carbonate veins in a moderate chlorite altered andesite. The second interval consists of 4% disseminated, clustered and stringer pyrite with quartz-carbonate veinlets in a bleached andesite.

OSK-W-19-2027 intersected 4.46 g/t Au over 6.0 metres and 3.20 g/t Au over 2.6 metres in F-11. Mineralization in both intervals consists of up to 7% disseminated and stringer pyrite in a bleached andesite.

OSK-W-19-2031 intersected 14.9 g/t Au over 2.2 metres in Bobcat. Mineralization consists of 5% pyrite stringers, 3% disseminated pyrite, 1% pyrite clusters quartz tourmaline veins, and quartz carbonate veins hosted in a moderate silica and weak sericite altered fragmental felsic intrusion.

OSK-W-19-2055 intersected 12.4 g/t Au over 2.2 metres and 7.50 g/t Au over 2.1 metres in F-51. The first interval consists of local visible gold, 5% pyrite stringers, 4% disseminated and clustered pyrite with pervasive silica flooding hosted in a moderate sericite and bleached basalt. The second interval consists of 4% disseminated pyrite, 3% pyrite stringers, and 2% pyrite clusters with local quartz-carbonate veinlets hosted in a moderate sericite altered porphyritic felsic dike.

OSK-W-19-2061 intersected 4.72 g/t Au over 2.0 metres in Lynx. Mineralization consists of 3% disseminated pyrite in a faulted and bleached andesite with moderate carbonate and strong sericite alteration.

OSK-W-19-2066 intersected 59.1 g/t Au over 2.2 metres in F-51. Mineralization consists of 5% disseminated, clustered, and stinger pyrite with quartz-carbonate veinlets in a breccia zone with moderate sericite and strong silica alteration and trace pyrite-tourmaline stringers hosted is a strong silica altered gabbro.

OSK-W-19-2067 intersected 3.16 g/t Au over 2.0 meters in Triple Lynx. Mineralization consists of 2% pyrite stringers and 3% disseminated pyrite in a moderate chlorite and weak silica-sericite altered rhyolite.

OSK-W-19-2067-W4 intersected 3.70 g/t Au over 4.3 metres, 6.88 g/t Au over 3.5 metres, 12.2 g/t Au over 3.0 metres, 5.46 g/t Au over 2.5 metres, 15.4 g/t Au over 3.6 metres and 5.56 g/t Au over 5.0 metres in Triple Lynx. The first and second intervals consist of up to 2% disseminated pyrite, 1% pyrite clusters and stringers in a weak chlorite-sericite to locally moderate silica altered rhyolite.  The third interval consists of trace disseminated and stringer pyrite in a weak sericite altered rhyolite. The fourth interval consists of 5% disseminated and clustered pyrite, 1% sphalerite, and trace galena with smoky quartz veins hosted in a weak sericite altered porphyritic dike at the contact with a weak sericite altered rhyolite.  The fifth interval consists of 3% pyrite stringers with tourmaline ptygmatic veins in a weak sericite altered porphyritic dike. The last interval consists of trace disseminated pyrite and trace sphalerite-pyrite stringers in a weak sericite altered rhyolite.

OSK-W-19-2068 intersected 4.17 g/t Au over 2.2 metres in Lynx. Mineralization consists of 1% pyrite in a massive sulfide vein hosted in a moderate sericite and silica altered rhyolite.

OSK-W-19-2080 intersected 8.68 g/t Au over 2.0 metres, 28.2 g/t Au over 3.6 metres and 5.09 g/t Au over 2.3 metres in F-51. The first interval consists of 3% pyrite stringers in a moderate silica and weak sericite altered gabbro. The second and third intervals consist of 5% pyrite stringers, 1% disseminated pyrite, 2% pyrite clusters with quartz-tourmaline veins with pervasive silica flooding, and local crustiform quartz-carbonate veins. All three intervals are hosted in a strong silica and moderate sericite altered gabbro in contact with a felsic dike.

OSK-W-19-2081 intersected 44.7 g/t Au over 2.3 metres in Bobcat. Mineralization consists of 1% interstitial pyrite and trace pyrite with quartz-tourmaline veins in a weak silica-sericite altered fragmental felsic intrusion.

OSK-W-19-2082 intersected 5.11 g/t Au over 3.0 metres in Bobcat. Mineralization consists of 5% pyrite stringers hosted in weak silica altered and bleached porphyritic felsic intrusion.

OSK-W-19-2083 intersected 3.67 g/t Au over 2.0 metres in Caribou. Mineralization consists of 20% pyrite stringers in a strong sericite altered and bleached rhyolite.

OSK-W-19-2086 intersected 6.76 g/t Au over 2.0 metres in F-51. Mineralization consists of 3% pyrite stringers and 2% pyrite clusters with quartz-tourmaline veins hosted in a weak silica altered fragmental felsic intrusion in contact with a moderate chlorite altered gabbro.

OSK-W-19-2087 intersected 4.59 g/t Au over 2.0 metres in F-51. Mineralization consists of 2% disseminated, clustered, and stringer pyrite and 1% interstitial pyrite hosted in a moderate sericite-fuchsite and weak silica altered, bleached and brecciated gabbro.

OSK-W-19-2100-W4 intersected 9.80 g/t Au over 2.5 metres in Triple Lynx. Mineralization consists of 1% pyrite-tourmaline veinlets and 2% pyrite with silica flooding and quartz veins at the contact between a weak sericite and moderate silica altered rhyolite and a porphyritic felsic dike. This interval confirms the extension of Triple Lynx 50 metres above and to the northeast of hole OSK-W-19-2100 (9.23 g/t Au over 8.0 metres, see Osisko press release dated December 18, 2019).

OSK-W-19-2101 intersected 9.33 g/t Au over 3.7 metres in Triple Lynx. Mineralization consists of 3% pyrite in a quartz-tourmaline veins, up to 2% pyrite with stockwork texture, up to 1% disseminated, clustered, and stringer pyrite with quartz-carbonate veins hosted in a weak sericite-silica-chlorite altered rhyolite. This interval confirms the extension of Triple Lynx 50 metres up-plunge of OSK-W-19-2077 (10.7 g/t Au over 6.0 metres, see Osisko press release dated October 21, 2019).

OSK-W-19-2104 intersected 3.13 g/t Au over 2.7 metres in F-11. Mineralization consists of trace disseminated pyrite in a weak sericite altered porphyritic felsic dike.

OSK-W-19-2107-W2 intersected 12.2 g/t Au over 2.1 metres in Lynx and 3.82 g/t Au over 2.0 metres in Triple Lynx. The first interval consists of local visible gold, 5% disseminated and stringer pyrite as well as pyrite stringers with smoky quartz veins and tourmaline-pyrite veinlets hosted in a moderate sericite altered fragmental felsic intrusion. The second interval consists of trace disseminated and stringer pyrite in a weak sericite altered and foliated rhyolite.

OSK-W-19-2108-W2 intersected 6.50 g/t Au over 2.3 metres in Triple Lynx. Mineralization consists of up to 10% pyrite ±tourmaline stringers and trace sphalerite with pervasive silica flooding hosted in a rhyolite with moderate sericite and strong silica alteration with several small fragmental felsic dikes.

OSK-W-19-2120-W3 intersected 3.33 g/t Au over 2.4 metres in Lynx. Mineralization consists of 5% disseminated pyrite in a moderate sericite-silica-fuchsite altered rhyolite. 

OSK-W-19-2139 intersected 6.93 g/t Au over 7.4 metres, 106 g/t Au over 4.0 metres and 3.19 g/t Au over 2.0 metres in Triple Lynx. The first interval consists of trace disseminated pyrite with quartz veins in a weak sericite and silica altered rhyolite. The second interval consists of local visible gold, 30% semi-massive pyrite and 10% disseminated pyrite with dismembered smoky quartz veins hosted in a weak to moderate silica altered rhyolite. The third interval consists of 1% disseminated and stringer pyrite in a weak silica-sericite altered rhyolite.

OSK-W-19-2139-W2 intersected 22.9 g/t Au over 2.3 metres, 4.99 metres over 2.1 metres, 3.03 g/t Au over 2.0 metres and 5.66 g/t Au over 2.3 metres in Triple Lynx. The first interval consists of 3% pyrite-tourmaline stringers, 2% pyrite clusters and trace disseminated sphalerite hosted in a strongly silicified rhyolite. The second interval consists of 1% pyrite stringers, 2% pyrite clusters with a quartz carbonate vein, and trace ptygmatic tourmaline veins hosted in a moderate sericite and silica altered rhyolite. The third interval consists of 1% disseminated pyrite and trace pyrite stringers in a weak sericite altered rhyolite. The fourth interval consists of 5% pyrite clusters and local disseminated sphalerite in a moderate silica-sericite altered rhyolite.

OSK-W-19-2160 intersected 3.37 g/t Au over 2.0 metres in Lynx. Mineralization consists of trace disseminated pyrite in a weak carbonate altered gabbro.

OSK-W-19-2170 intersected 35.5 g/t Au over 2.7 metres, 3.96 g/t Au over 2.1 metres and 44.7 g/t Au over 3.2 metres in Triple Lynx. The first interval consists of 2% pyrite with tourmaline ptygmatic veinlets, 5% pyrite stringers and trace chalcopyrite clusters hosted in a moderate to strong fuchsite and weak sericite altered gabbro. The second interval consists of 5% pyrite stringers and 1% disseminated pyrite with weak silica and sericite alteration at the contact between a rhyolite and a porphyritic felsic dike. The third interval consists of local visible gold and 5% disseminated pyrite with pervasive silica flooding in a moderate silica altered rhyolite in the contact with a porphyritic felsic dike. Theses three intervals confirm the extension of Triple Lynx 70 metres toward the surface and to the north-east.

OSK-W-19-2178 intersected 13.4 g/t Au over 2.3 metres in Lynx. Mineralization consists of 2% pyrite stringers, 2% pyrite with quartz tourmaline veins, and 1% pyrite clusters in a moderate chlorite altered gabbro.

OSK-W-19-2181 intersected 4.11 g/t Au over 2.1 metres and 10.2 g/t Au over 2.6 metres in Lynx. The first interval consists of 3% disseminated, clustered, and stringer pyrite with crustiform quartz-carbonate and quartz-tourmaline veinlets hosted in a moderate sericite altered rhyolite at the contact with a moderately bleached and weak sericite altered andesite. The second interval contains up to 16% clustered and disseminated pyrite with local stockwork texture and smoky quartz veinlets, and 4% disseminated and clustered pyrite with quartz-tourmaline veinlets hosted in a moderate silica and weak sericite altered rhyolite.

OSK-W-19-2183 intersected 8.41 g/t Au over 2.1 metres in Lynx. Mineralization consists of 10% disseminated and stringer pyrite, and 2% chalcopyrite clusters with quartz or quartz-carbonate veins hosted in a moderate sericite-silica-fuchsite altered and foliated gabbro.

OSK-W-19-2184 intersected 18.0 g/t Au over 2.4 metres in Lynx. Mineralization consists of local visible gold, up to 4% disseminated pyrite and with pervasive silica flooding, and 2% pyrite stringers hosted in a weak to strong silica and weak sericite altered rhyolite.

OSK-W-19-2186 intersected 14.4 g/t Au over 2.1 metres and 6.42 g/t Au over 2.0 metres in Lynx. The first interval consists of trace disseminated and clustered pyrite with local pervasive silica flooding hosted in a weak sericite and silica altered rhyolite.  The second interval consists of 4% disseminated, clustered, and stringer pyrite in a moderate silica and weak sericite altered fragmental felsic intrusion.

OSK-W-19-2188 intersected 5.01 g/t Au over 2.1 metres and 7.50 g/t Au over 2.0 metres in Lynx. The first interval consists of 2% disseminated, stringer, and clustered pyrite with pervasive silica flooding hosted in a moderate silica and weak sericite altered rhyolite. The second interval consists of 5% disseminated and clustered pyrite with pervasive silica flooding and 2% pyrite stringers hosted in a weak to moderate silica and weak sericite altered rhyolite.

OSK-W-19-2191 intersected 5.68 g/t Au over 2.4 metres in Lynx. Mineralization consists of 2% disseminated, clustered, and stringer pyrite with pervasive silica flooding hosted in a moderate silica and weak sericite altered rhyolite.

OSK-W-19-2193 intersected 4.29 g/t Au over 2.2 metres in Lynx. Mineralization consists of local visible gold, up to 10% disseminated and clustered pyrite with pervasive silica flooding, and 2% pyrite stringers hosted in a weak to moderate sericite altered fragmental felsic intrusion.

OSK-W-19-2195 intersected 18.8 g/t Au over 2.1 metres in Lynx. Mineralization consists of 1% pyrite stringers and trace disseminated pyrite in a moderate chlorite-carbonate altered and bleached gabbro.

WST-19-0029 intersected 3.65 g/t Au over 2.0 metres in Zone 27. Mineralization consists of trace disseminated pyrite in a strong sericite and weak fuchsite altered rhyolite. WST-19-0029 was drilled from underground drill station AN-140-270-S located 140 metres below surface from section 2575E.

WST-19-0030 intersected 3.33 g/t Au over 2.0 metres and 7.91 g/t Au over 2.0 metres in Zone 27. The first interval consists of 3% pyrite stringers with quartz-tourmaline veins in a moderate sericite altered porphyritic felsic dike. The second interval consists of 1% pyrite clusters and with quartz-carbonates veins, 5% pyrite stringers with quartz-tourmaline veins, and 1% pyrite stringers and clusters in a moderate chlorite altered andesite at the contact with a moderate sericite-chlorite altered porphyritic felsic dike. WST-19-0030 was drilled from underground drill station AN-140-270-S located 140 metres below surface from section 2575E.

WST-19-0033 intersected 6.24 g/t Au over 2.5 metres in Zone 27. Mineralization consists of 10% disseminated, clustered, and stringer pyrite with quartz-tourmaline veins in a moderate silica-chlorite and weak fuchsite altered gabbro at the contact with a moderate sericite altered rhyolite. WST-19-0033 was drilled from underground drill station AN-140-270-S located 140 metres below surface from section 2575E.

WST-19-0076 intersected 3.22 g/t Au over 2.3 metres in Zone 27. Mineralization consists of 20% pyrite in stockwork and semi-massive bands in a strong silica and moderate sericite altered rhyolite at the contact with a porphyritic felsic dike. WST-19-0076 was drilled from underground drill station AN-150-200-E located 150 metres below surface from section 2475E.

WST-19-0160A intersected 8.04 g/t Au over 3.6 metres in Zone 27. Mineralization consists of 30 to 70% pyrite and tourmaline ptygmatic veinlets hosted in a moderate sericite altered and bleached andesite. WST-19-0160A was drilled from underground drill station AN-195-225-E located 195 metres below surface from section 2400E.

WST-19-0161A intersected 8.71 g/t Au over 4.0 metres and 18.5 g/t Au over 9.0 metres in Zone 27. The first interval consists of 15% disseminated pyrite with quartz-carbonate veins in a moderate sericite altered and bleached andesite. The second interval consists of 15% disseminated pyrite and 1% chalcopyrite in a moderate silica and weak sericite altered porphyritic felsic dike. WST-19-0161A was drilled from underground drill station AN-195-225-E located 195 metres below surface from section 2400E.

WST-19-0162 intersected 5.85 g/t Au over 4.0 metres in Zone 27. Mineralization consists of 20% disseminated pyrite in a moderate sericite and weak silica altered and bleached andesite. WST-19-0162 was drilled from underground drill station AN-195-225-E located 195 metres below surface from section 2400E.

WST-19-0183 intersected 3.92 g/t Au over 2.0 metres in Zone 27. Mineralization consists of 40% semi-massive pyrite in a moderate sericite and weak silica altered porphyritic felsic dike. WST-19-0183 was drilled from underground drill station AN-140-270-S located 140 metres below surface from section 2575E.

WST-19-0184 intersected 4.41 g/t Au over 2.0 metres in Zone 27. Mineralization consists of 35% semi-massive pyrite hosted in a moderate silica altered rhyolite. WST-19-0184 was drilled from underground drill station AN-140-270-S located 140 metres below surface from section 2575E.

WST-19-0186 intersected 4.17 g/t Au over 2.0 metres in Zone 27. Mineralization consists of 3% disseminated pyrite in a weak silica altered rhyolite. WST-19-0186 was drilled from underground drill station AN-140-270-S located 140 metres below surface from section 2575E.

WST-19-0187 intersected 6.02 g/t Au over 2.1 metres in Zone 27. Mineralization consists of 1% pyrite in quartz-carbonate veins, trace pyrite-tourmaline stringers, and 2% disseminated, clustered, and stringer pyrite hosted in a weak silica altered and bleached andesite. WST-19-0187 was drilled from underground drill station RA-195-225-O located 185 metres below surface from section 2250E.

WST-19-0188 intersected 3.46 g/t Au over 5.05 metres in Caribou and 4.93 g/t Au over 2.0 metres and 76.6 g/t Au over 2.1 metres in Zone 27. The first interval consists of 10% pyrite stringers in a weakly bleached porphyritic felsic dike. The second interval consist of 20% disseminated and trace pyrite with tourmaline ptygmatic veins hosted in moderately bleached andesite. The third interval consists of 25% disseminated pyrite with pervasive silica flooding and 5% pyrite stringers hosted in a strong silica altered and brecciated porphyritic felsic intrusion. WST-19-0188 was drilled from underground drill station RA-195-225-O located 185 metres below surface from section 2250E.

WST-19-0189 intersected 8.22 g/t Au over 2.0 metres and 3.08 g/t Au over 2.1 metres in Zone 27. The first interval consists of 2% pyrite stringers in a weak silica-sericite altered porphyritic felsic dike. The second interval consists of 10% pyrite-tourmaline stringers, 5% fragmental pyrite, and 2% disseminated, clustered, and stringer pyrite hosted in a weak sericite altered porphyritic felsic dike. WST-19-0189 was drilled from underground drill station RA-195-225-O located 185 metres below surface from section 2250E.

WST-19-0190 intersected 3.42 g/t Au over 3.4 metres in Zone 27. Mineralization consists of 4% pyrite tourmaline ptygmatic veins and 1% disseminated pyrite in a weak silica altered porphyritic felsic dike. WST-19-0189 was drilled from underground drill station RA-195-225-O located 185 metres below surface from section 2250E.

WST-19-0191 intersected 9.13 g/t Au over 2.2 metres in Zone 27. Mineralization consists of 3% disseminated pyrite, 2% pyrite-tourmaline stringers and 5% pyrite stringers hosted in moderate silica altered and bleached andesite. WST-19-0191 was drilled from underground drill station RA-195-225-O located 185 metres below surface from section 2250E.

WST-19-0192 intersected 3.31 g/t Au over 2.3 metres in Caribou, 9.05 g/t Au over 2.8 metres and 7.08 g/t Au over 2.3 metres in Zone 27. The first interval consists of 15% pyrite-tourmaline stringers and trace disseminated pyrite in a moderate sericite, weak silica altered and strongly bleached andesite. The second interval consists of 3% pyrite with quartz-tourmaline veinlets, 3% disseminated pyrite with quartz veins, and 2% pyrite stringers hosted in moderate sericite altered porphyritic felsic dike. The third interval consists of 10% pyrite and pyrite-tourmaline stringers hosted in a moderate sericite altered porphyritic felsic dike. WST-19-0192 was drilled from underground drill station RA-195-225-O located 185 metres below surface from section 2250E.

WST-19-0193 intersected 3.34 g/t Au over 2.0 metres in Caribou and 9.26 g/t Au over 2.5 metres in Zone 27. The first interval consists of 10% pyrite-tourmaline stringers in a moderate sericite and weak silica altered porphyritic felsic dike. The second interval consists of 7% disseminated pyrite with quartz-carbonate veins and pyrite-tourmaline stringers hosted in a moderate silica-sericite and weak fuchsite altered gabbro. WST-19-0193 was drilled from underground drill station RA-195-225-O located 195 metres below surface from section 2325E.

WST-19-0194 intersected 6.42 g/t Au over 2.1 metres in Zone 27. Mineralization consists of trace disseminated pyrite in a moderate chlorite and weak silica-sericite altered rhyolite. WST-19-0210 was drilled from underground drill station RA-195-225-O located 195 metres below surface from section 2325E.

WST-19-0210 intersected 7.30 g/t Au over 2.0 metres in Lynx. Mineralization consists of trace disseminated pyrite in a moderate chlorite and weak silica-sericite altered rhyolite. WST-19-0210 was drilled from underground drill station AN-225-190-O located 225 metres below surface from section 3425E.

WST-19-0214 intersected 6.72 g/t Au over 2.3 metres in Caribou. Mineralization consists of 5% pyrite stringers and 2% pyrite clusters with weak local silica alteration hosted in a moderate sericite altered rhyolite. WST-19-0214 was drilled from underground drill station AN-140-270-S located 140 metres below surface from section 2575E.

WST-19-0219 intersected 3.98 g/t Au over 2.0 metres in Caribou. Mineralization consists of trace disseminated and stringer pyrite hosted in a moderate silica altered porphyritic felsic dike. WST-19-0219 was drilled from underground drill station BF-160-150-S located 160 metres below surface from section 2400E.

WST-19-0220 intersected 8.46 g/t Au over 2.1 metres in Zone 27 and 4.01 g/t Au over 2.1 metres, and 5.24 g/t Au over 2.0 metres in Caribou. The first interval consists of trace disseminated and clustered pyrite in a moderate sericite altered gabbro. The second interval consists of 3% pyrite stringers and trace sphalerite hosted in a moderate sericite and weak silica altered porphyritic felsic dike. The third interval consists of 6% pyrite stringers with silica flooding hosted in a moderate sericite and silica altered rhyolite. WST-19-0220 was drilled from underground drill station BF-160-150-S located 160 metres below surface from section 2400E.

WST-19-0221 intersected 14.5 g/t Au over 2.0 metres in Caribou. Mineralization consists of 3% pyrite stringers with silica flooding hosted in a moderate sericite altered rhyolite. WST-19-0221 was drilled from underground drill station BF-160-150-S located 160 metres below surface from section 2400E.

WST-19-0222A intersected 4.52 g/t Au over 2.0 metres, 6.66 g/t Au over 2.0 metres, 3.07 g/t Au over 2.4 metres and 83.8 g/t Au over 2.1 metres in Caribou. The first interval consists of 5% pyrite stringers in stockwork and 1% disseminated pyrite in a moderate sericite and strongly silica altered rhyolite and porphyritic felsic dike. The second interval consists of trace pyrite stringers in a moderate sericite altered porphyritic dike. The third interval consists of trace pyrite stringers and 1% pyrite with quartz-carbonate veins in a moderate silica-sericite-chlorite altered porphyritic felsic dike. The fourth interval consists of local visible gold, 2% disseminated chalcopyrite and pyrite with quartz-tourmaline veins and 1% disseminated pyrite hosted in a moderate sericite altered porphyritic felsic dike. WST-19-0222A was drilled from underground drill station AN-150-200-E located 150 metres below surface from section 2475E.

WST-19-0223 intersected 3.46 g/t Au over 2.0 metres in Caribou. Mineralization consists of 3% disseminated, clustered and stringer pyrite with quart-tourmaline veinlets and tourmaline ptygmatic veinlets hosted in a moderate sericite altered porphyritic felsic dike at the contact with a moderate sericite altered rhyolite. WST-19-0223 was drilled from underground drill station AN-150-200-E located 150 metres below surface from section 2475E.

WST-19-0224 intersected 12.6 g/t Au over 5.1 metres in Caribou. Mineralization consists of 20% disseminated, clustered and stringer pyrite hosted in a strongly silica and moderate sericite altered porphyritic felsic intrusion. WST-19-0224 was drilled from underground drill station AN-150-200-E located 150 metres below surface from section 2475E.

WST-19-0225 intersected 4.64 g/t Au over 2.3 metres in Caribou. Mineralization consists of 2% pyrite clusters and 1% pyrite stringers hosted in a bleached rhyolite. WST-19-0225 was drilled from underground drill station AN-150-200-E located 150 metres below surface from section 2475E.

WST-19-0226 intersected 46.4 g/t Au over 2.4 metres in Zone 27. Mineralization consists of 10% pyrite clusters and 3% pyrite stringers hosted in a moderate sericite altered rhyolite. WST-19-0226 was drilled from underground drill station AN-140-270-S located 140 metres below surface from section 2575E.

WST-19-0227 intersected 26.7 g/t Au over 2.0 metres and 3.18 g/t Au over 2.0 metres in Caribou. The first interval consists of 25% pyrite in semi-massive bands and 2% pyrite ±tourmaline veinlets in a strong silica altered faulted rhyolite. The second interval consists of 20% pyrite stringers with a quartz-tourmaline vein hosted in a moderate silica and sericite altered and faulted rhyolite.WST-19-0227 was drilled from underground drill station AN-140-270-S located 140 metres below surface from section 2575E.

WST-19-0244 intersected 8.22 g/t Au over 3.3 metres, 21.1 g/t Au over 2.0 metres and 26.9 g/t Au over 3.4 metres in Lynx. The first interval consists of local visible gold in a smoky quartz vein hosted in a moderate sericite and weak silica altered fragmental felsic intrusion. The second interval consists of local visible gold and 3% disseminated pyrite with pervasive silica flooding hosted in a moderate sericite-fuchsite and locally strong silica altered rhyolite. The third interval consists of 5% pyrite stringers and trace chalcopyrite with local dismembered pseudo-crustiform veins hosted in a moderate sericite-silica-fuchsite altered rhyolite. WST-19-0244 was drilled from underground drill station AN-195-265-S located 195 metres below surface from section 3500E.

WST-19-0245 intersected 8.54 g/t Au over 2.8 metres in Lynx. Mineralization consists of local visible gold and 5% pyrite stringers in a dismembered smoky quartz vein hosted in a moderate sericite and weak silica altered fragmental felsic intrusion. WST-19-0245 was drilled from underground drill station AN-195-265-S located 195 metres below surface from section 3500E.

WST-19-0246 intersected 3.55 g/t Au over 2.1 metres in Lynx. Mineralization consists of 1% pyrite stringers with dismembered smoky quartz veinlets hosted in a moderate sericite and weak silica altered rhyolite. WST-19-0246 was drilled from underground drill station AN-195-265-S located 195 metres below surface from section 3500E.

WST-19-0247 intersected 29.8 g/t Au over 2.0 metres in Lynx. Mineralization consists of local visible gold and 8% disseminated and stringer pyrite associated with smoky quartz veins hosted in a fragmental felsic intrusion with moderate to strong silica alteration. WST-19-0247 was drilled from underground drill station AN-195-265-S located 195 metres below surface from section 3500E.

WST-19-0248 intersected 5.76 g/t Au over 2.5 metres in Lynx. Mineralization consists of 5% disseminated pyrite within a smoky quartz vein in a fragmental felsic intrusion with moderate to strong silica alteration. WST-19-0248 was drilled from underground drill station AN-195-265-S located 195 metres below surface from section 3500E.

WST-19-0250 intersected 4.02 g/t Au over 2.0 metres, 30.2 g/t Au over 2.6 metres, 3.05 g/t Au over 2.3 metres and 8.30 g/t Au over 2.0 metres in Lynx. The first interval consists of local visible gold, 2% disseminated pyrite, and trace pyrite and sphalerite in fracture filling with pervasive silica flooding hosted in a weak silica-fuchsite and moderate sericite altered fragmental felsic intrusion. The second interval consists of local visible gold and 3% disseminated pyrite with pervasive silica flooding hosted in a moderate sericite altered fragmental felsic intrusion. The third interval consists of 3% disseminated pyrite and trace pyrite stringers in a moderate sericite altered fragmental felsic intrusion. The last interval consists of local visible gold and 1% pyrite in a 4-centimetre wide vein hosted in a moderate sericite and weak silica altered fragmental felsic intrusion. WST-19-0250 was drilled from underground drill station RA-180-190-E located 195 metres below surface from section 3450E.

WST-19-0251 intersected 135 g/t Au over 2.5 metres in Lynx. Mineralization consists of local visible gold, 2% pyrite clusters and trace sphalerite with weak pervasive silica flooding hosted in a weak sericite altered fragmental felsic intrusion. WST-19-0251 was drilled from underground drill station RA-180-190-E located 180 metres below surface from section 3450E.

WST-19-0252 intersected 7.31 g/t Au over 2.1 metres, 8.78 g/t Au over 2.2 metres and 6.29 g/t Au over 2.1 metres in Lynx. Mineralization in all three intervals consists of local visible gold, up to 15% pyrite, and local sphalerite with pervasive silica flooding hosted in a moderate sericite and moderate to strong silica altered fragmental felsic intrusion. WST-19-0252 was drilled from underground drill station RA-180-190-E located 180 metres below surface from section 3450E.

WST-19-0253 intersected 38.4 g/t Au over 2.3 metres, 8.32 g/t Au over 2.1 metres, and 7.49 g/t Au over 2.4 metres in Lynx. The first interval consists of local visible gold, 20% pyrite, and 1% sphalerite with pervasive silica flooding hosted in a strong silica altered and moderate sericite altered fragmental felsic unit. The second interval consists local visible gold, trace electrum, 10% pyrite and 1% sphalerite with pervasive silica flooding hosted at the contact between a moderate silica altered porphyritic felsic intrusion with a moderate sericite altered rhyolite. The third interval consists of trace disseminated and stringer pyrite in a weak sericite altered and strongly faulted rhyolite. WST-19-0253 was drilled from underground drill station RA-180-190-E located 180 metres below surface from section 3450E.

WST-19-0254 intersected 17.1 g/t Au over 2.4 metres and 5.84 g/t Au over 2.6 metres in Lynx. The first interval consists of 5% pyrite and 1% sphalerite with pervasive silica flooding in a moderate silica and fuchsite altered fragmental felsic dike. The second interval consists of 5% pyrite with pervasive silica flooding hosted at the moderately silicified contact between a fragmental felsic intrusion and a rhyolite. WST-19-0254 was drilled from underground drill station RA-180-190-E located 180 metres below surface from section 3450E.

WST-19-0263 intersected 4.26 g/t Au over 2.3 metres and 8.46 g/t Au over 2.5 metres in Lynx. Mineralization in both intervals consists of local visible gold in pervasive silica flooding and 5% disseminated, clustered, and stringer pyrite hosted in a moderate sericite altered fragmental intrusion. WST-19-0263 was drilled from underground drill station AN-195-265-S located 195 metres below surface from section 3500E.

WST-19-0272 intersected 9.29 g/t Au over 2.4 metres in Lynx. Mineralization consists of 4% pyrite stringers and clusters at the contact with a moderately bleached rhyolite and a moderate fuchsite altered gabbro.  WST-19-0272 was drilled from underground drill station BM-200-285-S located 200 metres below surface from section 3525E.

WST-19-0273A intersected 77.7 g/t Au over 2.1 metres in Lynx. Mineralization consists of 1% disseminated pyrite in a moderate silica and sericite altered and weakly faulted rhyolite. WST-19-0273A was drilled from underground drill station BM-200-285-S located 200 metres below surface from section 3525E.

WST-19-0276 intersected 17.8 g/t Au over 2.4 metres and 6.38 g/t Au over 2.1 metres in Lynx. Mineralization in both intervals consists of local visible gold, 7% disseminated and stringer pyrite in pervasive silica flooding with local quartz-tourmaline veins hosted in a strong silica and moderate to strong sericite altered rhyolite and the contact with a moderate silica and chlorite altered gabbro. WST-19-0276 was drilled from underground drill station BM-200-285-S located 200 metres below surface from section 3525E.

WST-19-0277 intersected 4.91 g/t Au over 2.3 metres in Lynx. Mineralization consists of 7% disseminated and clustered pyrite within a quartz-tourmaline veins and pyrite stringers with dismembered quartz veinlets hosted in a strong silica and moderate sericite and fuchsite altered gabbro with local bleaching. WST-19-0277 was drilled from underground drill station BM-200-285-S located 200 metres below surface from section 3525E.

WST-19-0278 intersected 7.27 g/t Au over 2.0 metres in Lynx. Mineralization consists of 5% disseminated and clustered pyrite with pervasive silica flooding and quartz-tourmaline veins hosted at the contact between a strong silica and moderate chlorite and fuchsite altered gabbro and a strong silica and moderate sericite altered rhyolite. WST-19-0278 was drilled from underground drill station BM-200-285-S located 200 metres below surface from section 3525E.

Qualified Person
The scientific and technical content of this news release has been reviewed, prepared and approved by Mr. Louis Grenier, M.Sc.A., P.Geo. (OGQ 800), Project Manager of Osisko's Windfall Lake gold project, who is a "qualified person" as defined by National Instrument 43-101 – Standards of Disclosure for Mineral Projects ("NI 43-101").

Quality Control and Reporting Protocols
True width determination is estimated at 55-80% of the reported core length interval for the zone. Assays are uncut except where indicated. Intercepts occur within geological confines of major zones but have not been correlated to individual vein domains at this time. Reported intervals include minimum weighted averages of 3.0 g/t Au diluted over core lengths of at least 2.0 metres. All NQ core assays reported were obtained by either 1-kilogram screen fire assay or standard 50-gram fire-assaying-AA finish or gravimetric finish at (i) ALS Laboratories in Val d'Or, Québec, Thunder Bay, Ontario, Sudbury, Ontario or Vancouver, British Colombia, or (ii) Bureau Veritas in Timmins, Ontario. The 1-kilogram screen assay method is selected by the geologist when samples contain coarse gold or present a higher percentage of pyrite than surrounding intervals. Selected samples are also analyzed for multi-elements, including silver, using an Aqua Regia-ICP-AES method at ALS Laboratories. Drill program design, Quality Assurance/Quality Control ("QA/QC") and interpretation of results is performed by qualified persons employing a QA/QC program consistent with NI 43-101 and industry best practices. Standards and blanks are included with every 20 samples for QA/QC purposes by the Corporation as well as the lab. Approximately 5% of sample pulps are sent to secondary laboratories for check assay.

About the Windfall Lake Gold Deposit
The Windfall Lake gold deposit is located between Val-d'Or and Chibougamau in the Abitibi region of Québec, Canada. The mineral resource defined by Osisko, as disclosed in the Windfall Lake Technical Report (as defined below) and November 27, 2018 Lynx resource update, comprises 2,874,000 tonnes at 8.17 g/t Au (754,000 ounces) in the indicated mineral resource category and 10,352,000 tonnes at 7.11 g/t Au (2,366,000 ounces) in the inferred mineral resource category. For details regarding the key assumptions, parameters and methods used to estimate the mineral resources presented in respect of the Windfall Lake gold project, please see the technical report entitled "Technical Report and Mineral Resource Estimate for the Windfall Lake Project, Windfall Lake and Urban-Barry Properties" and dated June 12, 2018 (effective date of May 14, 2018), which has been prepared by InnovExplo Inc. from Val-d'Or, Québec (the "Windfall Lake Technical Report") and the press release “Osisko Releases Mineral Resource Update for Lynx” dated November 27, 2018, which has been prepared by Osisko and reviewed and approved by Micon International, Ltd. from Toronto, Ontario. The Windfall Lake Technical Report and press release are available on Osisko's website at www.osiskomining.com and on SEDAR under Osisko's issuer profile at www.sedar.com. The Windfall Lake gold deposit is currently one of the highest-grade resource-stage gold projects in Canada. Mineralization occurs in four principal zones: Lynx, Zone 27, Caribou and Underdog. All zones comprise sub-vertical lenses following intrusive porphyry contacts plunging to the northeast. The deposit is well defined from surface to a depth of 900 metres and remains open along strike and at depth. Mineralization has been identified 30 metres from surface in some areas and as deep as 2,000 metres in others, with significant potential to extend mineralization down-plunge and at depth.

About Osisko Mining Inc.
Osisko is a mineral exploration company focused on the acquisition, exploration, and development of precious metal resource properties in Canada. Osisko holds a 100% interest in the high-grade Windfall Lake gold deposit located between Val-d'Or and Chibougamau in Québec and holds a 100% undivided interest in a large area of claims in the surrounding the Urban Barry area and nearby Quévillon area (over 2,700 square kilometres).

Cautionary Note Regarding Forward-Looking Information
This news release contains "forward-looking information" within the meaning of the applicable Canadian securities legislation that is based on expectations, estimates, projections and interpretations as at the date of this news release. The information in this news release about the Windfall Lake gold deposit being one of the highest grade resource-stage gold projects in Canada; the significance of results from the new infill drilling and ongoing drill definition and expansion program at the Windfall Lake gold project; the significance of assay results presented in this news release; the deposit remaining open along strike and at depth; potential depth extensions of the mineralized zones down-plunge and at depth; the actual mineralization of local visible gold; the current drill program; the type of drilling included in the drill program; potential mineralization; the potential to extend mineralization up and down-plunge and at depth at the Windfall Lake gold deposit; the ability to realize upon any mineralization in a manner that is economic; the ability to complete any proposed exploration activities and the results of such activities, including the continuity or extension of any mineralization; and any other information herein that is not a historical fact may be "forward-looking information". Any statement that involves discussions with respect to predictions, expectations, interpretations, beliefs, plans, projections, objectives, assumptions, future events or performance (often but not always using phrases such as "expects", or "does not expect", "is expected", "interpreted", "management's view", "anticipates" or "does not anticipate", "plans", "budget", "scheduled", "forecasts", "estimates", "believes" or "intends" or variations of such words and phrases or stating that certain actions, events or results "may" or "could", "would", "might" or "will" be taken to occur or be achieved) are not statements of historical fact and may be forward-looking information and are intended to identify forward- looking information. This forward-looking information is based on reasonable assumptions and estimates of management of the Corporation at the time such assumptions and estimates were made, and involves known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of Osisko to be materially different from any future results, performance or achievements expressed or implied by such forward-looking information. Such factors include, among others, risks relating to the ability of exploration activities (including drill results) to accurately predict mineralization; errors in management's geological modelling; the ability of Osisko to complete further exploration activities, including drilling; property interests in the Windfall Lake gold project; the ability of the Corporation to obtain required approvals and complete transactions on terms announced; the results of exploration activities; risks relating to mining activities; the global economic climate; metal prices; dilution; environmental risks; and community and non-governmental actions. Although the forward-looking information contained in this news release is based upon what management believes, or believed at the time, to be reasonable assumptions. Osisko cannot assure shareholders and prospective purchasers of securities of the Corporation that actual results will be consistent with such forward-looking information, as there may be other factors that cause results not to be as anticipated, estimated or intended, and neither Osisko nor any other person assumes responsibility for the accuracy and completeness of any such forward-looking information, Osisko does not undertake, and assumes no obligation, to update or revise any such forward-looking statements or forward-looking information contained herein to reflect new events or circumstances, except as may be required by law.

For further information please contact: John Burzynski
President and Chief Executive Officer Telephone: (416) 363-8653