Figure 7

Figure 7

Cross section E-E’ looking northeast, showing drill hole KAD26-523A with 2026 MRE Block Model, interpreted mineralization and 2026 MRE Resource Pit Shell. The upper intersection sits within the resource pit in material not included in the 2026 MRE. Intersections approximately 50 to 75 metres below the resource pit sit below blocks classified as Inferred Mineral Resources. Previously released and historical drill holes as well as intersections from this release that did not meet the highlight section criteria are shown in grey. Reported intervals are estimated true width (ETW). Areas shown as interpreted mineralization represent the Company's geological interpretation of mineralization intersected in drilling. They are not included in the 2026 Mineral Resource Estimate, as drill spacing in these areas is currently insufficient. They are not Mineral Resources and there is no certainty that further drilling will result in their inclusion in a Mineral Resource.

Format

JPEG

Source

Cadillac Mines Corporation

Downloads