IT - Genium INET for Fixed Income project update (75/11)


Thank you for your participation in MWAT1 on the 28th of April and MWAT2 last Thursday. There was a lot of activity from the participants and overall results are promising. We are now looking at all the comments from the market and we will send out updates for additional testing if needed, besides the following:

  • Danish Issuing Auctions tomorrow and on Wednesday, please see separate IT Notice. Please note; if you are using test participant IDs, inform memberservices@nasdaqomx.com to ensure that you are properly authorized and configured.
  • FIX fail-over test will be executed on Thursday in Ext2 on May 12th at 14:00 CET.
  • STO Currency Fixing testing will be planned before MWAT3.
  • There will be trade halt tests during MWAT3.
  • We will always send out an IT Notice as soon as a new Trading Workstation build is published.

 

Maintenance on Ext2 on Wednesday May 11th

The Genium INET Ext2 system includes Fixed Income as well as Nordic derivatives products and users.

The Ext2 system will be upgraded during the Genium INET maintenance window on May 11 after 15:00 CET together with a normal GCF refresh.

 

Reference data updates

The data in the test environment will be copied from SAXESS Production as of Monday May 2.

There have been miscellaneous fine tuning of the configuration of the markets.

The migrated reference data in Genium INET External Test 2 will be distributed over OMnet and GCF3. In GCF3 the Genium INET External Test 2 reference data will get new GCF id:s (IdCode in TIP) except orderbook IDs, which will remain the same. Any client application storing reference data historically may need to be refreshed depending on what database keys are used.

If you are using the Genium INET Trading Workstation, please make sure you uncheck the “Restore Cached Static Data” box on the detailed logon screen, after logging on after the upgrade.

 

Documentation and project updates

Recently updated Genium INET for Fixed Income documents on our member extranet include:

  • Updated MWAT documents
  • New release of the Trading Workstation (v5892)
  • New User guide to the Trading Workstation
  • New Genium INET Fixed Income Nordic and Baltic User Configuration document released
  • FIX specification 1.03

 

For more details regarding the project, please see:

http://nordic.nasdaqomxtrader.com/memberextranet/genium_inet/

 

The main dates in our master time schedule for Genium INET for Fixed income are:

 

May 19th                   MWAT 3

May 30th                   Technical upgrade of Genium INET production

May 31st-June 17th       Login and verification towards production

June 20th                      Go Live

 

memberservices@nasdaqomx.com should be contacted for Genium INET for Fixed Income accounts (OMnet sessions) and Market Data GCF accounts (TIP sessions) as well as the changed passwords needed to connect.

 

For technical questions, please contact technicalsupport@nasdaqomx.com; for project related information or business questions, please contact Fredrik von Platen or Poul Erik Egeberg. For TIP related questions, please contact operator@nasdaqomx.com.

 

 

Fredrik von Platen                             Poul Erik Egeberg

+46 8 405 6439                                 +45 33 770 361

Genium INET Market readiness       Fixed Income Markets

 

 

Best regards,

Nasdaq OMX Nordic


Attachments

IT_Exchange_Notice_75-11 Upgrade 11 May 2011.pdf
GlobeNewswire